ArticleMaterials (Basel, Switzerland)2026
Model Test on the Multi-Effects of Tunneling and Excavation upon an Existing Pile in Clay.
Article in Materials (Basel, Switzerland), 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
8 authors.
Funding
Abstract
Existing studies often analyze tunnels and excavations as isolated projects, but in practice they are often constructed sequentially or simultaneously. This paper investigates their combined effects on adjacent pile foundations in clay using constant-gravity model tests and 3D numerical methods, considering time-dependent clay behavior and small-strain stiffness. Two combined construction sequences of tunnelling and excavation adjacent to an existing pile were investigated: (i) tunnel excavation followed by basement excavation (i.e., test TEP); (ii) basement excavation followed by tunnel excavation (i.e., test ETP). Results show that construction sequence has little effect on surface settlement but significantly influences pile response. Pile top settlement increases considerably when tunnelling occurs near piles. The TEP sequence reduces cumulative pile top settlement by 0.38% of the pile diameter and reduces the maximum cumulative bending moment by approximately 31% compared with the ETP sequence. Additionally, tunnel and excavation construction generate negative excess pore water pressure in the surrounding soil, which dissipates over time. The pressure increases with proximity to the tunnel face or excavation base.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.