An efficient Draco lizard optimized stacked Bi-LSTM framework for risk mitigation and resource allocation in project management systems.
Article in Scientific reports, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Modern project management demands the mitigation of risk factors in conjunction with optimal resource utilization. Traditional approaches to risk mitigation, based on subjective assessment and supportive static tools, cannot operate effectively in a project environment filled with dynamics. Advanced analytics, artificial intelligence, and deep learning drive data-based decision-making and are able to bring forth predictive insights leading to adaptive management strategies. This paper proposed advanced deep learning approaches to improve risk reduction and optimization of resource allocation in software project management systems. First, the raw historical dataset, collected from the sources that are freely available, is gathered and preprocessed. The dataset collected contains a lot of irrelevance, which causes prediction error and computation complexity. In this regard, the pre-processing, such as one-hot encoding and normalization of data, is done, which reduces issues of data redundancy. After pre-processing, a stacked bidirectional long short-term network S-BiLSTM is proposed for the joint prediction of risks and enhancement of decision power for resource scheduling. Further, optimal resource allocation is carried out by the employment of the Draco lizard optimization DLO technique based on different parameters comprising project complexity, integration complexity, schedule pressure, team size, team experience, technology risk, and risk management maturity. The proposed framework is analyzed through a simulation on the Python platform. Various factors, such as accuracy, workload distribution analysis, resource optimization efficiency , convergence analysis, training time, and resource utilization rate, are analyzed and compared with conventional approaches to demonstrate the proposed approach's efficiency. The proposed approach achieves a predictive accuracy of 99.2%, significantly improving the performance of the PMS in project risk identification.