The interplay and incremental development of tidal stream arrays in the Pentland Firth.
Article in Journal of ocean engineering and marine energy, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
The development of tidal stream energy sites is constrained by numerous practical, technical, and accessible constraints, including changes in the flow caused by the presence of the tidal farm. Large and complex sites are typically developed incrementally and may involve multiple developers. This regional modelling case study of the Pentland Firth, widely regarded as one of the most significant global locations for tidal energy extraction, investigates these dynamics. This study examines scenarios for the incremental development of the Pentland Firth, incorporating assumptions regarding tidal farm design. The analysis considers a range of configurations, including variations in turbine density and the incorporation of shipping lanes within designated lease areas. The study finds that there are interactions between individually developed tidal farms of the site, but they are moderate with the power in a given farm unlikely to vary by more than 20% (based on a positive interaction), as a result of the development of other farms in other parts of the Pentland Firth. To minimise such array interactions, it is recommended that site leasing be based on the allowable thrust applied to the flow rather than on projected power generation. Furthermore, the findings suggest that the maximum power generated from turbines in the Pentland Firth, averaged over time, is unlikely to exceed approximately 1 GW, broadly consistent with most estimates in the literature.