ArticleEnvironmental science & technology2026

Emissions and Cost Trade-Offs of Time-Matched Clean Electricity Procurement under Interannual Weather Variability: A Case Study of Hydrogen Production.

Michael A Giovanniello, Dharik S Mallapragada

Abstract read
In one paragraph

Article in Environmental science & technology, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Michael A GiovannielloMIT Energy Initiative, Massachusetts Institute of Technology, Cambridge, Massachusetts 02139, United States.
Dharik S MallapragadaChemical and Biomolecular Engineering Department, Tandon School of Engineering, New York University, Brooklyn, New York 11201, United States.ORCID 0000-0002-0330-0063

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Regulators and voluntary corporate sustainability efforts are increasingly adopting time-matching requirements (TMRs) for clean electricity procurement for large loads, such as data centers, and electricity-intensive fuel production, such as hydrogen. We use a stochastic capacity expansion model (CEM) framework to assess how interannual weather variability affects the cost and emissions impact of procurement-driven infrastructure to meet annual and hourly TMRs using the case study of a grid-connected hydrogen producer in Texas. Our approach, which relies on co-optimizing investments and hourly operations over nine weather scenarios, reveals that hourly TMR comes at a higher cost premium compared to annual TMR than previously estimated by single-scenario deterministic modeling, while emissions outcomes remain directionally consistent. Demand flexibility and partial hourly TMR (80-90%) lowers the cost premium while preserving emissions benefits. We further examine how binding renewable portfolio standards (RPS) interact with TMR costs and emissions outcomes. When an RPS is applied to non-H

Indexed as

ElectricityHydrogenWeatherModels, TheoreticalHydrogencapacity expansion modelingconsequential emissionsdemand flexibilityemissions accountinghourly time-matching

Identifiers

PMID42406460
PMCPMC13394394

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.