Evidence map›Paper›PMID 42349993›Full record

ArticleBMJ open quality2026

Reducing unnecessary bed days to optimise flow and improve demand-capacity mismatch: learning from a system-wide patient flow collaborative.

Kenneth Jun Logrono, Mohamed Salem Khalil, Mohammed Abuqamar, Elizabeth Tamara Biong, Luay Alsmadi, Juliet Jalmasco, Pradeep Radhakrishnan, Khadija Al-Shukaili, Belal Salem Mufadi Zubi, Esmat Swallmeh and 2 more

Abstract read
In one paragraph

Article in BMJ open quality, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

12 authors.

Kenneth Jun LogronoNursing Performance and Practice Improvement Department, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar KLogrono@hamad.qa.ORCID 0000-0002-7617-9794
Mohamed Salem KhalilGeneral Medicine, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Mohammed AbuqamarMedical Nursing Inpatient, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.ORCID 0009-0007-2896-859X
Elizabeth Tamara BiongMedical Patient Flow Department, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Luay AlsmadiMedical Patient Flow Department, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Juliet JalmascoMedical Patient Flow Department, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Pradeep RadhakrishnanGeneral Medicine, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Khadija Al-ShukailiExecutive Director, Clinical Services Development, Hamad Medical Corporation, Doha, Qatar.
Belal Salem Mufadi ZubiMedical Nursing Inpatient, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Esmat SwallmehMedical Nursing Inpatient, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Emad Mraweh Mohammed MustafaNursing Executive, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.
Muna Al-MaslamaniChief Executive Officer and Medical Director, Hamad General Hospital, Hamad Medical Corporation, Doha, Qatar.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

backgroundDischarge delays and unnecessary bed days (UBDs) are known to cause increasing Emergency Department (ED) boarding and account for over 20% of inappropriate hospital bed use. The aim of this project is to reduce the number of UBDs by 25% (from 1500 days to 1100 days) and increase bed availability at 7 a.m. by 15% (from 0 to 1-2 beds) for medical inpatient beds over a year.

methodsThe implementation of change was facilitated by the Institute for Healthcare Improvement (IHI) Model for Improvement, with iterative testing through PDSA cycles. Quality improvement (QI) tools such as fishbone diagram, Pareto chart, and high-level flow diagrams were used to understand system drivers of delay and prioritise change ideas. Shewhart charts were used to distinguish between common-cause and special-cause variations.

resultsThe reasons for UBD and flow failures were classified as lack of capability, lack of capacity, lack of payment, patient refusal, and delayed planning. Within a year of initiating the QI project, UBDs decreased by 68% (from 1522.7 to 493.4 days), increased the availability of staffed beds at 7 a.m. by 87% (from 1.5 to 2.8 beds) and reduced ED pending admissions by 23% (from 12.1 to 9.3 patients). These improvements temporarily coincided with the implementation of several change ideas-integrated early discharge planning, the use of a CPS tool, and early involvement of social workers.

conclusionSeveral systems and throughput factors, in addition to staff capacity, may contribute to increasing the availability of hospital beds and reducing UBDs. QI methods and tools can rapidly uncover, test, and implement opportunities for improving patient flow from ED to inpatient units.

Indexed as

Bed OccupancyLength of StayEmergency Service, HospitalHumansQuality ImprovementControl charts/Run chartsEmergency departmentProcess mappingQuality improvementStatistical process control

Identifiers

PMID42349993
PMCPMC13311690

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.