ArticleSensors (Basel, Switzerland)2026
A Data-Driven Spatiotemporal Risk Assessment Framework for Transformer Overload in Distributed Renewable Energy System.
Article in Sensors (Basel, Switzerland), 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors.
Funding
Abstract
In distributed renewable energy systems, load fluctuations caused by energy resources and energy storage increase the overload risk of distribution transformers, which may accelerate insulation aging and cause overheating, and undermine operational reliability. For transformer condition monitoring, this risk is reflected not by a single variable but by heterogeneous sensing observations acquired from electrical, thermal, and equipment status monitoring channels. Because full-scale inspection of latent defects is impractical under limited staffing and equipment resources, accurate overload risk prediction is important for sensor-driven maintenance allocation. With such motivations, this paper proposes a Transformer Overload Risk Assessment (TORA) approach for robust overload risk prediction under nonstationary load conditions. First, a feature matrix is constructed by jointly incorporating static features that capture long-term drift and dynamic features extracted from multisource sensing and supervisory signals that reflect short-term fluctuations. Then, static and dynamic features are assessed with Edge-based Static Feature Risk Assessment (E-SFRA) model and Cloud-based Dynamic Feature Risk Assessment (C-DFRA) model, respectively, according to their temporal and statistical characteristics. Next, a periodic calibration model (CE-PAA) is established through a cloud-edge loop, which uses low-latency edge updates and high-capacity cloud computation as feedback. Finally, risk score fusion (RSF) fuses generated static and dynamic risk scores to integrate cloud and edge strengths. The case study results indicate that TORA can transform heterogeneous monitoring signals into calibrated risk information in the studied single power plant scenario, providing useful support for multisource sensor data fusion, transformer condition monitoring, and maintenance decision making. Further validation using multi source field datasets is still needed to assess its cross scenario generalization ability.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.