Evidence map›Paper›PMID 42085435›Full record

ArticlePloS one2026

An Indicator contribution-oriented assessment framework for identifying dominant fire risk drivers in cable tunnels: Development and case study.

Liming Li, Yongyu Wang, Bo Liu, Liwei Song, Wentao Ma

Abstract read
In one paragraph

Article in PloS one, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors.

Liming LiShenyang Fire Science and Technology Research Institute of MEM, Shenyang, Liaoning, P.R. China.ORCID https://orcid.org/0000-0003-1653-1773
Yongyu WangShenyang Fire Science and Technology Research Institute of MEM, Shenyang, Liaoning, P.R. China.
Bo LiuShenyang Fire Science and Technology Research Institute of MEM, Shenyang, Liaoning, P.R. China.
Liwei SongShenyang Fire Science and Technology Research Institute of MEM, Shenyang, Liaoning, P.R. China.
Wentao MaShenyang Fire Science and Technology Research Institute of MEM, Shenyang, Liaoning, P.R. China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Cable tunnels are critical components of urban power supply systems, where fire incidents can cause severe safety consequences due to high cable density and confined environments. Effective fire risk management is challenged not only by risk quantification, but also by limited understanding of which factors dominantly drive fire risk variation across tunnel segments.This study proposes a contribution-oriented fire risk assessment framework for cable tunnels that integrates hierarchical indicator weighting with indicator contribution analysis. A structured fire risk indicator system is established based on fire accident mechanisms, engineering standards, and expert knowledge. A composite fire risk index is calculated for segmented tunnel units, and a perturbation-based contribution analysis is conducted to quantify the marginal influence of individual indicators on overall risk levels. Scenario-based analyses are further employed to examine the effectiveness of alternative fire prevention and management strategies. A case study shows that cable tunnel fire risk is governed by a limited number of dominant drivers rather than uniform contributions from all indicators. Structural integrity-related factors, such as fire door integrity and joint defects, together with key operational and management indicators, exhibit the strongest influence on fire risk formation. The results also reveal pronounced spatial heterogeneity in fire risk distribution and differentiated responses to management interventions. By identifying dominant fire risk drivers and their contribution characteristics, the proposed framework enhances the interpretability and practical value of fire risk assessment, supporting targeted risk control and resource prioritization in cable tunnel safety management.

Indexed as

FiresPower PlantsRisk Assessment

Identifiers

PMID42085435
PMCPMC13143090

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.