ArticleMining technology (Abingdon, Eng.)2025

Dynamic multi-period mixed-integer non-linear programming model for equipment selection in the mining industry.

Sena Senses, Mustafa Kumral

Abstract read
In one paragraph

Article in Mining technology (Abingdon, Eng.), 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Sena SensesDepartment of Mining and Materials Engineering, McGill University, Montreal, Canada.
Mustafa KumralDepartment of Mining and Materials Engineering, McGill University, Montreal, Canada.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Planning an equipment fleet is a complex engineering challenge involving (1) the capacity selection of equipment pieces forming a fleet, (2) the determination of fleet size, (3) strategic timing of equipment acquisitions, and (4) ensuring compatibility between interconnected equipment. Selecting equipment type involves evaluating capacity to meet production requirements effectively while considering operational constraints. It also requires determining the optimal number of units to avoid underutilisation or redundancy. In multi-period projects, the timing of equipment acquisition further adds complexity, as decisions must align with production rates that evolve over time. Moreover, matching equipment types is essential to ensure smooth and efficient workflows. This study develops a dynamic multi-period mixed-integer non-linear programming model to optimise equipment selection, considering capital recovery, operating costs, and equipment availability under match factor and production constraints. The model's effectiveness is demonstrated through a case study encompassing greenfield and brownfield scenarios in open-pit mining operations. The greenfield scenario emphasises phased equipment acquisition to align with production ramp-up and minimising initial costs. The brownfield scenario addresses the integration of aging and new equipment to sustain operational efficiency. The results highlight the model's flexibility and applicability, offering a robust tool for optimising equipment selection while balancing cost and performance.

Indexed as

equipment selectionfleet managementmaterial handling systemsmixed-integer non-linear programmingoperational efficiency

Identifiers

PMID42078820
PMCPMC13131275

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.