Evidence map›Paper›PMID 41991992›Full record

ArticleScientific reports2026

Research on mechanism and control technique of floor heave in deep soft rock roadway at Banji Coal Mine.

Xun Zhang, Laiwang Jing, Hailong Dong, Heng He, Jiang Lv, Maoru Sun, Yuanfeng Fan

Abstract read
In one paragraph

Article in Scientific reports, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

7 authors.

Xun Zhang *Banji Coal Mine, Xinji Energy Company Limited, National Coal Group Corporation, Bozhou, 236744, Anhui, China.
Laiwang Jing *Nanjing Jingwei Mining Technology Research Institute Company Limited, Nanjing, 210003, China.
Hailong Dong *Nanjing Jingwei Mining Technology Research Institute Company Limited, Nanjing, 210003, China. 824426446@qq.com.
Heng HeBanji Coal Mine, Xinji Energy Company Limited, National Coal Group Corporation, Bozhou, 236744, Anhui, China.
Jiang LvNanjing Jingwei Mining Technology Research Institute Company Limited, Nanjing, 210003, China.
Maoru SunBanji Coal Mine, Xinji Energy Company Limited, National Coal Group Corporation, Bozhou, 236744, Anhui, China.
Yuanfeng FanBanji Coal Mine, Xinji Energy Company Limited, National Coal Group Corporation, Bozhou, 236744, Anhui, China.

Funding

Anhui Provincial Natural Science Foundation General Project 2408085MD101Guizhou institute of technology in China 2023GCC40the National Natural Science Foundation of China for the Regional Project Funding 52564008Water Resources Bureau of Bijie City, Guizhou Province, China KT202442
6 · The paper itself

Abstract

Aiming at the severe floor heave occurring at the machine head section of the belt conveyor downhill roadway in the 1105 mining area of Banji Coal Mine, Bozhou, Anhui, a systematic investigation was conducted using mechanism analysis, numerical simulation, and on-site industrial testing to elucidate the multifactorial mechanism and control technique of floor heave in deep soft rock roadways. The dominant factors contributing to roadway floor heave were identified as high horizontal tectonic stress, weak floor lithology, high water content in the floor strata, and deficiencies in the original support system. Subsequently, the loosening zone of the roadway floor was detected, and the development characteristics of floor plastic deformation and deformation concentration were analyzed in detail. On this basis, the reasonable effective depth for grouting reinforcement was determined. Accordingly, an integrated floor heave control technique combining deep-hole high-pressure grouting and drainage was proposed to reinforce and strengthen the roadway structure. A numerical model was then established to comparatively analyze roadway deformation over a three-month period under conditions with and without reinforcement. The results indicated that the overall stress state of the surrounding rock was significantly improved after reinforcement, leading to effective control of floor heave deformation, while deformation of the roof and sidewalls was simultaneously mitigated. Furthermore, on-site monitoring results demonstrated that 30 d after grouting, floor subsidence, inwardconvergence of the two sides, and floor heave of the roadway all reduced quickly, and the deformation gradually stabilized. These findings confirm that the proposed floor heave control technique can effectively suppress deformation of the roadway surrounding rock and ensure safe and stable operation.

Indexed as

Banji Coal MineControl techniqueDeep soft rock roadwayFloor heave mechanismNumerical simulation

Identifiers

PMID41991992
PMCPMC13246774

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.