Evidence map›Paper›PMID 41826394›Full record

ArticleScientific reports2026

A data-driven life cycle cost model for tender evaluation of metro pantograph carbon strips.

Jie Liu, Chuang Wu

Abstract read
In one paragraph

Article in Scientific reports, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Jie Liu *School of Intelligent Manufacturing and Transportation, Chongqing Vocational Institute of Engineering, Jiangjin District, Chongqing, China. 943069788@qq.com.
Chuang Wu *Maintenance Department, Chongqing Rail Transit (Group) Co.Ltd, Yubei District, Chongqing, China.

Funding

the College-level Teaching Reform Project of Chongqing Vocational Institute and Engineering JG2025035the Science Technology Research Program of Chongqing Municipal Education Commission KJQN202303402
6 · The paper itself

Abstract

Statistical analysis of pantograph carbon strip procurement reveals substantial performance variation among suppliers and indicates that prevalent scoring methods often fall into a “low-bid trap,” yielding economically suboptimal outcomes. To address this issue, this study introduced a data-driven, discounted life cycle cost bidding model and applied it to Chongqing Metro Line 6 as a case study. The model treats high-frequency consumable expenditures as uniform annuity streams and integrates empirically estimated wear rates and service life variability into net present value cost functions for procurement, maintenance, inventory, and mileage non-compliance penalties. Application of the model produced a pronounced rank reversal: the supplier selected by the traditional lowest-bid rule incurred a life cycle cost roughly 1.6 times that of the best-value supplier. Sensitivity analysis showed that this cost-ratio and the resulting ranking did not change for discount rates between 0% and 8%, demonstrating that the economic advantage of greater durability persists when the time value of money is considered. Unlike static weighting schemes, the proposed framework explicitly monetizes both engineering variability and timing of cash flows, offering a principled basis to distinguish suppliers by actual operational value and thereby reducing adverse selection in public-transit infrastructure procurement.

Indexed as

Bidding assessment criteriaLife cycle costingMetroPantograph carbon strip

Identifiers

PMID41826394
PMCPMC12988185

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.