Critical risk identification in construction projects using 2D and 3D risk matrices.

Shamal Ali Othman, Dalshad Kakasor Ismael Jaff, Ahmet Öztaş

Erratum issuedAbstract read
In one paragraph

Article in PloS one, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. An erratum has been issued. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

5 · Who and what money

Authors and funding

3 authors.

Shamal Ali OthmanDepartment of Civil Engineering, College of Engineering, Salahaddin University-Erbil, Erbil, Kurdistan Region, Iraq.ORCID https://orcid.org/0000-0002-7860-1362
Dalshad Kakasor Ismael JaffDepartment of Civil Engineering, College of Engineering, Salahaddin University-Erbil, Erbil, Kurdistan Region, Iraq.
Ahmet ÖztaşDepartment of Civil Engineering, Epoka University, Tirana, Albania.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Construction projects are exposed to numerous risks that may adversely affect project cost and duration. The purpose of this study is to identify and prioritize key construction risks by combining a Work Breakdown Structure (WBS) with a Risk Breakdown Structure (RBS) and analyzing these risks using two-dimensional (2D) and three-dimensional (3D) risk matrices. In total, 63 risk factors were identified and categorized into five main areas of the work breakdown structure: earthwork, concrete, finishing, mechanical, and electrical. The questionnaire was designed based on each risk category and then sent to engineers, who were asked to estimate the risk probability and its impact. In total, 378 engineers responded. The respondents data were analyzed by using the risk matrix method. Two separate 3D risk matrices were made: one was based on multiplying all three data points, and the other was based on combining both impacts. The results clearly show that the 3D matrix, which combines cost and time impact, yields more accurate results than the matrix that multiplies cost impact and time impact.

Indexed as

Construction IndustryConstruction MaterialsHumansRisk AssessmentRisk FactorsSurveys and Questionnaires

Identifiers

PMID41785271
PMCPMC12962523

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.