Integration of AR and deep learning-based image classification using CNN for construction project monitoring.

Su-Ling Fan, Bao-Yu Lin, Chun-Tin Wu, Hee Yong Youn, Faustyn Recha, Jakub Świerzawski, Marek Malucha

Abstract read
In one paragraph

Article in Scientific reports, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

7 authors.

Su-Ling FanDepartment of Civil Engineering, and Research Development Center of Construction Law, Tamkang University, No. 151, Ying-Chuan Road, Tamsui, New Taipei County, Taiwan. fansuling@gms.tku.edu.tw.
Bao-Yu LinFeng Yu Construction Co. Ltd, 2F-2, No. 108, Minquan Road, Xindian District, New Taipei City, 231, Taiwan.
Chun-Tin WuResearch Development Center of Construction Law, Tamkang University, No. 151, Ying-Chuan Road, Tamsui, Taipei County, Taiwan.
Hee Yong YounDepartment of Intelligent Software, Sungkyunkwan University, Seobu-ro 2066, Jangan-gu, Gyeonggi-do, Republic of Korea.
Faustyn RechaFaculty of Architecture, Civil Engineering and Applied Arts, Academy of Silesia, No. 43, Rolna Street, 42-555, Katowice, Poland.
Jakub ŚwierzawskiFaculty of Architecture, Civil Engineering and Applied Arts, Academy of Silesia, No. 43, Rolna Street, 42-555, Katowice, Poland.
Marek MaluchaFaculty of Architecture, Civil Engineering and Applied Arts, Academy of Silesia, No. 43, Rolna Street, 42-555, Katowice, Poland.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

With manual update, progress monitoring of a construction project is notably challenging due to its labor-intensive and time-consuming nature. The issue of manual update has been proposed to be alleviated by automatic update, but most existing AI-based progress tracking approaches are based on counting the elements finished. As a result, they cannot accurately reflect actual progress status to the project management. This research aims to develop a system that updates the progress of the construction project by effectively identifying both the construction category and operational stage. It is achieved by systematically integrating the techniques of Augmented Reality (AR) and deep learning-based image classification with convolutional neural networks (CNNs). The proposed scheme enables real-time data capture, facilitating comprehensive progress evaluation across multiple project locations. Its effectiveness is demonstrated using a case study of an interior finishing project for a building in Tamkang University, Taiwan. It reveals that the proposed system accurately identifies the construction category and operational stage based on the materials applied, enabling precise tracking of the progress. The results confirm that the proposed scheme significantly enhances the accuracy in construction progress monitoring, avoiding manual inspection and minimizing discrepancies between the planned and actual progress.

Indexed as

Artificial intelligenceAugmented realityConstruction progress monitoringImage classificationInterior finishingMachine learning

Identifiers

PMID41565721
PMCPMC12827964

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.