Evidence map›Paper›PMID 41502640›Full record

ArticleACS omega2025

Evolution of Overburden Fractures and the Water-Conducting Fracture Zone in Closely Spaced Coal Mine Seams under Highly Water-Rich Aquifers.

Xiong Liu, Lulin Zheng, Hao Liu, Yujun Zuo, Weide Ren, Xilong Zhu, Ximin Zhou

Abstract read
In one paragraph

Article in ACS omega, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

7 authors.

Xiong LiuMining College, Guizhou University, Guiyang 550025, China.
Lulin ZhengMining College, Guizhou University, Guiyang 550025, China.ORCID https://orcid.org/0000-0002-3643-2169
Hao LiuSchool of Civil Engineering and Urban Planing, Liupanshui Normal University, Liupanshui, Guizhou 553004, China.
Yujun ZuoMining College, Guizhou University, Guiyang 550025, China.
Weide RenGuizhou Lindong Coal Industry Development Co., Ltd. Longfeng Coal Mine, Jinsha, Guizhou 551800, China.
Xilong ZhuMining College, Guizhou University, Guiyang 550025, China.
Ximin ZhouMining College, Guizhou University, Guiyang 550025, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Risks of water-related mine incidents are related to water source, pathways, and water inrush intensity. This study aims to clarify the evolution of overburden fractures under repeated mining in closely spaced coal seams and to identify the presence of a connection between the damaged overburden and the overlying highly water-rich aquifer. Longfeng Coal Mine in northern Guizhou was taken as a case study. A coupled UDEC-DIC methodology was applied to identify fracture evolution and the development of water-conducting fracture zones during the downward mining of closely spaced coal seams. This approach allows an integrated study of fracture patterns, displacement, stress, and strain fields. Four key strata from the working face upward were identified, with breaking intervals of 22.72, 22.78, 24.08, and 100.79 m, respectively. The uppermost layer is a highly water-rich aquifer. During the early mining stage, risks of overburden collapse and fracture development were relatively minor. However, after advancing 30 m, overburden collapse, subsidence, and the vertical and horizontal development of fractures gradually intensified. After 110 m, fracture development gradually stabilized. The combination of UDEC numerical simulation and DIC digital speckle technology showed increasing vertical displacement and vertical stress of the overburden with the advance of the working face. During the evolution process, the overburden showed "saddle"- and "arch"-shaped patterns. The amplitudes of both the stress peak and displacement peak first showed a rapid increase, followed by a slow increase, and then finally a rapid increase. However, the displacement peak eventually stabilized, whereas the stress peak continued to increase. The strain peak fluctuated between increasing and decreasing trends over two cycles. The height of the water-conducting fracture zone first gradually increased, then rapidly increased, and lastly followed a stable increasing pattern. With the downward advance of the mine shaft, the increase in the fracture zone height showed a temporary halt and progressed again after the overburden of the lower coal seam collapsed and connected to the upper goaf. During the mining of the #5 coal seam, fracture height reached 41.7-42.8 m, thereby connecting to the highly water-rich Changxing Formation aquifer, resulting in a water inrush risk. Subsequent to the mining of the #5 and #9 coal seams, fracture height ultimately reached 90.2-91.2 m, connecting two highly water-rich aquifers and presenting a serious water hazard risk. The research findings hold significant theoretical and practical importance for water hazard prevention and water resource protection in coal mines.

Identifiers

PMID41502640
PMCPMC12772411

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.