Evidence map›Paper›PMID 41491307›Full record

ArticleScientific reports2026

Remaining useful life prediction and early warning model for high-speed railway contact system based on error-improved PSO-BiLSTM.

Li Liu, Yuting Gan, ZiJian Deng, PeiWen Cheng

Abstract read
In one paragraph

Article in Scientific reports, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Li LiuSchool of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, 330013, China.
Yuting GanSchool of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, 330013, China. ganyuting17@163.com.
ZiJian Deng *School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, 330013, China.
PeiWen Cheng *School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang, 330013, China.

Funding

National Natural Science Foundation of China 52462052Natural Science Foundation of Jiangxi Province 20232ACB204025
6 · The paper itself

Abstract

The high-speed railway contact system provides electricity to trains, and its stability and reliability directly impact train safety and performance. To avoid economic losses from excessive upkeep and shutdowns due to unclear predictions of the contact system's remaining useful life(RUL), an error-improved bidirectional long and short-term memory network (BiLSTM) early warning model is proposed, which firstly predicts the RUL of the contact system of high-speed railroads, and then combines the residuals of the predicted value to realize the fault warning of the contact system. The normalized contact system data are input into the PSO-BiLSTM model, and the relative error is corrected by using extreme gradient boosting (XGBoost). The research confirms that the RMSE of this prediction model decreases to 11.6293, and the MAE decreases to 7.9643; then reorder the maintenance data with pole number as index, perform feature parameter fusion based on the prediction residuals from the previous step, and use the kernel density estimation (KDE) method to determine the warning threshold, The results showed that the early warning model was able to predict contact system failures up to 30 days in advance, providing timely maintenance plans to identify potential failures and risks.

Indexed as

BiLSTMContact systemEarly warningExtreme gradient boostingRUL prediction

Identifiers

PMID41491307
PMCPMC12770529

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.