DSCostPred: a double-stacking model for construction cost prediction.

Chen-Ping Liu, Xin-Gen Sun, Jian-Hua Guan

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors.

Chen-Ping LiuDepartment of Architectural Engineering, Hunan Defense Industry Polytechnic, Xiangtan, 411207, China.
Xin-Gen SunSchool of Mathematics and Computational Science, Xiangtan University, Xiangtan, 411105, China.
Jian-Hua GuanSchool of Computational Science and Electronics, Hunan Institute of Engineering, Xiangtan, 411105, China. 25038@hnie.edu.cn.

Funding

Hunan Provincial Natural Science Foundation of China 2023JJ60199
6 · The paper itself

Abstract

The prediction of construction project cost plays a core role in engineering construction projects. However, the current prediction involves a multi-dimensional and dynamically variable system, and each major category can be further subdivided into many specific factors. Meanwhile, variables' relationships present a complex network of nonlinearity and interaction, which seriously affected the prediction accuracy. To solve this problem, we proposed a dual-stacking construction cost prediction method based on variable stacking and model stacking (DSCostPred). This method emphasizes that classifying variables and applying different algorithms respectively can avoid the impact of variables' functional differences. First, the variables are pre-classified to avoid mutual interference among them. Then, to learn the attribute and function positioning, as well as the complex interaction among them, different types of models are utilized to learn the variables. In algorithm design, to achieve the organic combination of multiple attributes and multiple models, a variable stacking is introduced into stacking ensemble learning to form collaborative predictions with model stacking. This method was compared with the classical method on real data, and the results show the superior performance. In addition, the ablation experiments and SHAP analysis also demonstrated the feasibility of the double-stacking idea we proposed.

Indexed as

Construction cost predictionDual-stacking methodModel stackingVariable stacking

Identifiers

PMID41422342
PMCPMC12834979

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.