ArticleBMJ quality & safety2026
Re-establishing control limits in statistical process control analyses: the stable shift algorithm.
Article in BMJ quality & safety, 2026. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
3 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Statistical process control (SPC) charts provide a natural approach to analysing time series data for healthcare quality improvement (QI) initiatives. A problem arising in practice is that having established baseline control limits, there is no accepted objective and transparent approach to deciding when to establish new control limits for a given chart. We present the Stable Shift Algorithm, a new algorithm to aid analysts by identifying when control limits should be re-established, partitioning a control chart of time series data into distinct time periods. The algorithm aims to achieve this while (1) using only the theory of SPC, familiar to many QI practitioners, (2) avoiding re-establishing limits prematurely and (3) remaining flexible to choice of basic parameters of typical control chart use in QI. This is achieved through the commonly used shift rule of control charts, applied to establish whether shifts warrant new control limits or not. We conducted a simulation study to evaluate the effectiveness of the algorithm in achieving its aims, and a case study demonstrating application of the algorithm to 557 time series of accident and emergency care measures for providers in England and Scotland. Simulation results show that the algorithm avoids premature re-establishment of limits more often than simply re-establishing at every shift rule break. Application of the algorithm to the accident and emergency measures demonstrates this is not achieved at the cost of excessive additional rule breaks that might indicate control limits do not represent the underlying process. The Stable Shift Algorithm offers a potentially highly valuable tool for QI practitioners and researchers undertaking SPC analyses, providing an automated, consistent and rigorous approach facilitating large-scale analyses.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.