Evidence map›Paper›PMID 41291011›Full record

ArticleScientific reports2025

Credible capacity evaluation of virtual power plants considering wind and PV uncertainties.

Chaojie Li, Jiang Dai, Silin Zhu, Ruyue Guo, Zhe Liu, Youquan Jiang, Shijin Tian, Yanyan Wen

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

8 authors.

Chaojie LiElectric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Jiang DaiElectric Power Dispatching Control Center of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Silin ZhuElectric Power Dispatching Control Center of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Ruyue GuoElectric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Zhe LiuElectric Power Research Institute of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Youquan JiangElectric Power Dispatching Control Center of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Shijin TianElectric Power Dispatching Control Center of Guizhou Power Grid Co., Ltd., Guiyang, 550002, China.
Yanyan WenQinghai Institute of Technology, Xining, China. yywen@qhit.edu.cn.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The increasing integration of weather-dependent renewable energy sources into Virtual Power Plants (VPPs) introduces significant uncertainty in short-term dispatch planning. This paper develops a comprehensive decision-making framework that jointly optimizes credible capacity allocation and operational dispatch under forecast uncertainty. We first compare three probabilistic forecasting methods-Bayesian Neural Networks (BNN), Quantile Regression Forests (QRF), and Gradient Boosted Decision Trees (GBDT)-to quantify wind and solar variability, using metrics such as root mean square error (RMSE), continuous ranked probability score (CRPS), and empirical coverage. BNN is selected as the primary forecasting tool due to its superior calibration and robustness across both resource types. A distributionally robust optimization (DRO) model is then formulated using a Wasserstein ambiguity set and a Conditional Value-at-Risk (CVaR) objective to hedge against worst-case renewable output scenarios. Empirical data from a stylized VPP system comprising 340 kW of installed renewables and urban mixed loads is used to evaluate the framework. Results indicate that the proposed DRO model reduces expected shortfall by up to 78% compared to deterministic baselines, and outperforms quantile-based models in both cost consistency and energy-not-supplied metrics. Scenario-based dispatch simulations reveal that increasing the CVaR confidence level from 90 to 99% improves system reliability from 95.1 to 99.7%, albeit with a 5.7% decline in expected profit. The analysis also quantifies the relative contribution of wind, solar, and load forecast errors to overall dispatch uncertainty. This work highlights the value of integrated probabilistic modelling and risk-aware optimization in enabling reliable and economically efficient VPP operations.

Identifiers

PMID41291011
PMCPMC12647671

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.