Evidence map›Paper›PMID 41156917›Full record

ArticleMaterials (Basel, Switzerland)2025

Life Cycle Assessment of the Construction and Demolition Waste Recovery Process.

Mateusz Malinowski, Zuzanna Basak, Stanisław Famielec, Arkadiusz Bieszczad, Sabina Angrecka, Stanisław Bodziacki

Abstract read
In one paragraph

Article in Materials (Basel, Switzerland), 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

6 authors.

Mateusz MalinowskiDepartment of Bioprocess Engineering, Power Engineering and Automation, Faculty of Production and Power Engineering, University of Agriculture in Kraków, 30-149 Kraków, Poland.ORCID 0000-0003-1364-1256
Zuzanna BasakDepartment of Bioprocess Engineering, Power Engineering and Automation, Faculty of Production and Power Engineering, University of Agriculture in Kraków, 30-149 Kraków, Poland.ORCID 0009-0004-0538-4194
Stanisław FamielecDepartment of Bioprocess Engineering, Power Engineering and Automation, Faculty of Production and Power Engineering, University of Agriculture in Kraków, 30-149 Kraków, Poland.ORCID 0000-0003-0685-2573
Arkadiusz BieszczadDepartment of Bioprocess Engineering, Power Engineering and Automation, Faculty of Production and Power Engineering, University of Agriculture in Kraków, 30-149 Kraków, Poland.ORCID 0000-0003-2643-2824
Sabina AngreckaDepartment of Rural Building, Faculty of Environmental Engineering and Land Surveying, University of Agriculture in Kraków, 31-120 Kraków, Poland.ORCID 0000-0002-4982-7346
Stanisław BodziackiDepartment of Microbiology and Biomonitoring, University of Agriculture in Kraków, 30-059 Kraków, Poland.ORCID 0000-0003-3027-1031

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Effective recovery of materials from construction and demolition waste (CDW) remains a major problem and a real challenge in terms of implementing the circular economy. In many countries, this waste is landfilled due to the lack of modern technological lines for its recovery and recycling, including the sorting of materials suitable for reuse. Understanding the environmental impact of the CDW treatment process is important as it constitutes the final stage of building life cycle assessment and the basis for eco-design of construction processes. In addition, the recovered materials can be used as raw materials for construction, thereby closing the waste loop and aligning with the circular economy concept. The purpose of this study is to compare the environmental impact of three different CDW recovery technologies in order to identify the optimal option. The analysis was performed using the life cycle assessment (LCA) methodology, SimaPro 8.1 software, and the Ecoinvent v3.8 database. 1 Mg of processed CDW was adopted as the functional unit. It was found that the process of recovering materials from CDW allows for sorting over 13% of materials for recycling and approx. 40% of raw materials for reuse (stone aggregates). The conducted analyses showed that all three installations exert a negative impact on the environment. Solution No. 2 had the lowest total environmental impact (15.96 Pt) under the assumptions and datasets used in this study, presenting average electricity and fuel consumption and average weight of sorted materials for recycling. Installation No. 3, which sorts the largest volume of materials for recycling, also used the most electricity; therefore, it could not be considered as the solution with the minimal overall environmental impact. The research revealed that the treatment of CDW in a crusher, applied at all installations, is the process stage resulting in the greatest environmental pressure (16.92 Pt). The high level of sorted recyclable waste enabled a relatively low carbon footprint for processes No. 2 and No. 3, 18.7 and 17.6 kg CO

Indexed as

circular economyenvironmental impact assessmentmaterial recoverywaste material compositionwaste treatment facilities

Identifiers

PMID41156917
PMCPMC12565953

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.