Evidence map›Paper›PMID 41021601›Full record

ArticlePloS one2025

Constructing a digital twin maturity assessment framework for the building construction phase based on an improved matter-element model: A case study of a construction project in Xinyang, China.

Qi Yang, Zongjun Xia, Xiaodan Li, Zhen Liu, Zhifei Chen, Jing Li, Yangyang Wang, Jinfeng Wang

Abstract read
In one paragraph

Article in PloS one, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

8 authors.

Qi YangState Key Laboratory for Tunnel Engineering, Beijing, China.
Zongjun XiaChina RAILWAY 15 BUREAU Group Corporation, Shanghai, China.
Xiaodan LiState Key Laboratory for Tunnel Engineering, Beijing, China.ORCID 0009-0009-5159-9678
Zhen LiuState Key Laboratory for Tunnel Engineering, Beijing, China.
Zhifei ChenChina RAILWAY 15 BUREAU Group Corporation, Shanghai, China.
Jing LiState Key Laboratory for Tunnel Engineering, Beijing, China.
Yangyang WangState Key Laboratory for Tunnel Engineering, Beijing, China.
Jinfeng WangChina RAILWAY 15 BUREAU Group Corporation, Shanghai, China.

Funding

National Natural Science Foundation of China 51778614Science and Technology R&D Project of China Railway 15th Bureau Group Co., Ltd 2023A6The funder of the National Natural Science Foundation of China
6 · The paper itself

Abstract

Digital twin technology has the potential to enhance construction efficiency, reduce costs, and minimize errors. However, its application during the construction phase remains at an early stage, largely constrained by the absence of standardized guidelines and principles. To address this challenge, it is essential to establish a comprehensive and universal maturity assessment framework to facilitate the effective implementation of this technology in the construction phase of building projects. This study focuses on two critical aspects: the development of the maturity assessment framework and its empirical validation. The proposed framework encompasses a maturity assessment indicator system covering five dimensions: acquisition layer, data layer, modeling layer, analysis layer, and application layer. For the first time, an optimized matter-element model based on dynamic thresholds and nonlinear correlation is introduced to improve the accuracy of maturity assessments. Furthermore, a feedback mechanism based on Importance-Performance Analysis (IPA) is utilized to clarify the formulation of optimization strategies. Finally, the framework is applied to the CAZ Innovation Industrial Park construction phase in Xinyang, Henan Province. The assessment results demonstrate that the system precisely measures the project's maturity level and provides effective improvement recommendations. This study not only offers technological support for assessing and optimizing the digital twin maturity during the construction phase of building projects but also provides methodological insights into global digital twin maturity assessments.

Indexed as

Construction IndustryDigital TechnologyModels, TheoreticalChinaHumans

Identifiers

PMID41021601
PMCPMC12478936

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.