ArticleSensors (Basel, Switzerland)2025
Scheduling Optimization of Electric Rubber-Tired Vehicles in Underground Coal Mines Based on Constraint Programming.
Article in Sensors (Basel, Switzerland), 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
Abstract
Underground coal mines face increasing challenges in the scheduling of Electric Rubber-Tired Vehicles (ERTVs) due to confined spaces, dynamic production demands, and the need to coordinate multiple constraints such as complex roadway topologies, strict time windows, and limited charging resources in the context of clean energy transitions. This study presents a Constraint Programming (CP)-based optimization framework that integrates Virtual Charging Station Mapping (VCSM) and sensor fusion positioning to decouple spatiotemporal charging conflicts and applies a dynamic topology adjustment algorithm to enhance computational efficiency. A novel RFID-vision fusion positioning system, leveraging multi-source data to mitigate signal interference in underground environments, provides real-time, reliable spatiotemporal coordinates for the scheduling model. The proposed multi-objective model systematically incorporates hard time windows, load limits, battery endurance, and roadway regulations. Case studies conducted using real-world data from a large-scale Chinese coal mine demonstrate that the method achieves a 17.6% reduction in total transportation mileage, decreases charging events by 60%, and reduces vehicle usage by approximately 33%, all while completely eliminating time window violations. Furthermore, the computational efficiency is improved by 54.4% compared to Mixed-Integer Linear Programming (MILP). By balancing economic and operational objectives, this approach provides a robust and scalable solution for sustainable ERTV scheduling in confined underground environments, with broader applicability to industrial logistics and clean mining practices.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.