Evidence map›Paper›PMID 40790143›Full record

ArticleScientific reports2025

Sensitivity analysis and monitoring of control parameters in cantilever casting construction of prestressed concrete continuous girder bridges.

Jinyang Zhang, Haiqing Liu, Xiangen Gong, Ming Lei, Liang Wang

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors.

Jinyang ZhangSchool of Civil Engineering, Liaoning Technical University, Fuxin, 123000, China. z_jy2022@163.com.
Haiqing LiuSchool of Civil Engineering, Liaoning Technical University, Fuxin, 123000, China.
Xiangen GongChina Construction Fifth Engineering Division Corp., Ltd., Changsha, 410004, China.
Ming LeiChina Construction Fifth Engineering Division Corp., Ltd., Changsha, 410004, China.
Liang WangChina Construction Fifth Engineering Division Corp., Ltd., Changsha, 410004, China.

Funding

China State Construction Engineering Corporation Technology Research and Development Project ZJKJ2023016
6 · The paper itself

Abstract

To ensure smooth closure of prestressed concrete continuous girder bridges and compliance of structural geometric alignment/stress with design requirements, this study employs finite element modeling to analyze the impact of variations in key construction control parameters during cantilever construction on bridge alignment and stress states at both the final completed stage and during maximum cantilever conditions. The investigated parameters encompass concrete unit weight, elastic modulus, prestressing loss, concrete shrinkage and creep, and temperature. Coupling effects among critical parameters were analyzed, leading to the establishment of a construction monitoring system that incorporates coupled effects of key control parameters. Results indicate that temperature variations and prestressing loss exert significant influences on girder alignment and stress, whereas concrete elastic modulus and unit weight exhibit relatively minor effects. Consequently, parameters exerting substantial impacts on alignment and stress require priority in monitoring to guarantee successful closure during cantilever construction.

Indexed as

Cantilever castingConstruction controlConstruction monitoringParameter sensitivityPrestressed concrete continuous girder bridge

Identifiers

PMID40790143
PMCPMC12339943

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.