Evidence map›Paper›PMID 40760073›Full record

ArticleScientific reports2025

Experimental study on dynamic response of existing tunnel lining structure by adjacent tunnel blasting load.

Bin Zhang, Chen Li, Jianlin Li, Ruizhe He, Xuefu Zhang, Xiaogang Li, Zijian Wang, Yi Wu

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

8 authors.

Bin ZhangSchool of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing, 401331, China.
Chen LiSchool of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing, 401331, China.
Jianlin LiSchool of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing, 401331, China.
Ruizhe HeSchool of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing, 401331, China.
Xuefu ZhangInstitute of Future Civil Engineering Science and Technology, Chongqing Jiaotong University, Chongqing, 400074, China. zhangxuefu400074@126.com.
Xiaogang LiSchool of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing, 401331, China. 2021058@cqust.edu.cn.
Zijian WangSchool of Civil and Hydraulic Engineering, Chongqing University of Science and Technology, Chongqing, 401331, China.
Yi WuInstitute of Future Civil Engineering Science and Technology, Chongqing Jiaotong University, Chongqing, 400074, China.

Funding

China Postdoctoral Science Foundation No. 2023MD734186Chongqing Municipal Education Commission Science and Technology Fund No. KJZD-M202204001Chongqing Natural Science Foundation General Project No. CSTB2023NSCQ-MSX0208, CSTB2022NSCQ-MSX0518Natural Science Foundation of Chongqing 2024NSCQ-LZX0138/2023NSCQ-MSX0197State Key Laboratory of Mountain Bridge and Tunnel Engineering Open Foundation No. SKLBT-2110
6 · The paper itself

Abstract

During tunnel construction by the drilling and blasting method, the blasting stress waves may affect the mechanical response of existing tunnel lining structure. Based on the similarity theory, a mechanical response of existing tunnel lining structure by blasting model test is designed. The similar material of surrounding rock, explosives, and tunnel lining structure are determined by the similarity of physical mechanical parameters. This study investigates the mechanical response of existing tunnel lining concrete and reinforcing steel‌ by the action of adjacent tunnel blasting. The experimental results reveal the maximum strain distribution and stress peak value of existing tunnel lining concrete and reinforcing steel‌ affected by blasting load. Meanwhile, the equations are established between the peak particle velocity (PPV) and the strain (or stress) in tunnel lining concrete and reinforcing steel‌ affected by adjacent tunnel blasting as well. These Eqs. (13) and (14) can be used to predict the maximum stress value of existing tunnel lining concrete and reinforcing steel‌ by the action of blasting load. Simultaneously, these equations have been validated and adjusted by an actual engineering project field test. Thus, evaluating the stress states of tunnel lining caused by adjacent tunnel blasting is more effective. This finding is of great significance for evaluating the stress state of existing tunnel lining structure, as well as providing theoretical guidance and reference for the design of blasting parameters on adjacent tunnel construction.

Indexed as

Blasting loadConcrete and reinforcing steel‌Model testStrain distributionTunnel blastingTunnel lining

Identifiers

PMID40760073
PMCPMC12322069

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.