Open pit design for improved gold recovery at Ula-Ulo placer deposit in Guji, southern Ethiopia.
Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
5 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
This study examines slope stability at the Ula Ulo Placer gold mine in the Adola Belt, Guji, southern Ethiopia, where open-pit mining enables flexible mineral extraction but presents significant stability concerns. Frequent slope failures have disrupted operations and delayed production. This research aims to evaluate and improve the stability of the open-pit excavation through an integrated approach combining field investigations, laboratory testing, and numerical modeling. Fieldwork included detailed slope geometry and orientation measurements, in situ testing, and soil and rock sampling for laboratory analysis. Stability assessment was performed using both the Limit Equilibrium Method (LEM) and the Finite Element Method (FEM) via Slide 2D (v6.0) and Phase2 (v8.0) software. The variables analyzed included bench angle, width, overall slope angle, and geotechnical properties under drained and undrained conditions. The analysis indicated that a 40° slope was unstable and unsuitable, while a 30° slope provided high stability but involved excessive excavation. A 35° slope was found to be the most practical solution, offering an effective balance between structural safety and excavation requirements.