Evidence map›Paper›PMID 40732628›Full record

ArticleSensors (Basel, Switzerland)2025

Assessment of the Risk of Failure in Electric Power Supply Systems for Railway Traffic Control Devices.

Tomasz Ciszewski, Jerzy Wojciechowski, Mieczysław Kornaszewski, Grzegorz Krawczyk, Beata Kuźmińska-Sołśnia, Artur Hermanowicz

Abstract read
In one paragraph

Article in Sensors (Basel, Switzerland), 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

6 authors.

Tomasz CiszewskiDepartment of Computer Science and Data Communication Technologies, Faculty of Transport, Electrical Engineering and Computer Science, Casimir Pulaski Radom University, Malczewskiego 29, 26-600 Radom, Poland.ORCID 0000-0002-5493-2116
Jerzy WojciechowskiDepartment of Electrical and Power Engineering, Faculty of Transport, Electrical Engineering and Computer Science, Casimir Pulaski Radom University, Malczewskiego 29, 26-600 Radom, Poland.ORCID 0000-0001-9102-9607
Mieczysław KornaszewskiDepartment of Control Systems and Electronics, Faculty of Transport, Electrical Engineering and Computer Science, Casimir Pulaski Radom University, Malczewskiego 29, 26-600 Radom, Poland.ORCID 0000-0002-0548-8688
Grzegorz KrawczykDepartment of Electrical and Power Engineering, Faculty of Transport, Electrical Engineering and Computer Science, Casimir Pulaski Radom University, Malczewskiego 29, 26-600 Radom, Poland.ORCID 0000-0003-1820-0847
Beata Kuźmińska-SołśniaDepartment of Computer Science and Data Communication Technologies, Faculty of Transport, Electrical Engineering and Computer Science, Casimir Pulaski Radom University, Malczewskiego 29, 26-600 Radom, Poland.ORCID 0000-0002-9715-932X
Artur HermanowiczDepartment of Computer Science and Data Communication Technologies, Faculty of Transport, Electrical Engineering and Computer Science, Casimir Pulaski Radom University, Malczewskiego 29, 26-600 Radom, Poland.ORCID 0000-0003-4401-7421

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

This paper provides a reliability analysis of selected components in the electrical power supply systems used for railway traffic control equipment. It includes rectifiers, controllers, inverters, generators, batteries, sensors, and switching elements. The study used failure data from power supply system elements on selected railway lines. The analysis was performed using a mathematical model based on Markov processes. Based on the findings, recommendations were made to improve safety levels. The results presented in the paper could serve as a valuable source of information for operators of power supply systems in railway traffic control, helping them optimize maintenance processes and increase equipment reliability.

Indexed as

maintenance processesMarkov processespower supply of railway traffic control equipmentreliability modelsafety

Identifiers

PMID40732628
PMCPMC12298357

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.