Life cycle cost of communication towers: identification and hierarchical classification of influencing factors.

Jing Zhang, Yang Wang, Qianyi Xu, Hongshuai Gao

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Jing ZhangSchool of Civil Engineering, Heilongjiang University, Harbin, 150080, People's Republic of China.
Yang WangSchool of Civil Engineering, Heilongjiang University, Harbin, 150080, People's Republic of China.
Qianyi XuCollege of Computer Science and Technology, College of Software, Heilongjiang University, Harbin, 150080, People's Republic of China. xuqianyi@hlju.edu.cn.
Hongshuai GaoSchool of Civil Engineering, Heilongjiang University, Harbin, 150080, People's Republic of China. hongshuai.gao@hlju.edu.cn.

Funding

Heilongjiang Province Ecological Environment Protection Research Project HST2023GF004Heilongjiang Provincial College and University 2022-KYYWF-1129Heilongjiang Provincial College and University 2024-KYYWF-0076Key laboratory of flood disaster risk warning and prevention and control, Ministry of Emergency Management 2024YJ007-003
6 · The paper itself

Abstract

Communication towers are essential infrastructure in modern society, require effective life cycle cost (LCC) control for long-term sustainability. While existing research has focused on structural optimization and technological advancements, few studies address cost-related issues across various stages, perspectives, and stakeholders. A multi-source factor identification approach was employed, combining literature review, field surveys, expert interviews, brainstorming, and questionnaires. An integrated Grey-SNA-ISM model was then developed. The method identified 49 factors influencing LCC, integrated Grey-SNA centrality indicators, and established four network hierarchies, which include source-driven, intermediary conduction, collaborative central control, and outcome response. A nine-layer causal hierarchy categorizes factors into fundamental, transitional, and direct influences, revealing a multi-level transmission path from institutional drivers to execution feedback. The results indicate that inadequate policy standards, insufficient management experience, and environmental constraints serve as top-level drivers. These factors flow through intermediary stages like procurement errors and design deviations, leading to downstream cost risks, such as construction delays and operational failures. This creates a dynamic, three-tier cascading structure at the strategic, organizational, and execution levels. The integrated model proposed demonstrates significant adaptability in LCC modeling for communication towers, offering methodological support for factor classification and path identification. Additionally, it shows potential for application in other complex cost systems, facilitating precise interventions and cost control throughout the life cycle.

Indexed as

Communications towerGrey-SNAISMLife cycle costMulti-source factor identification

Identifiers

PMID40594843
PMCPMC12216255

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.