Research on mechanical characteristics and key technology of integral intelligent lifting construction of large-span heavy steel box girder.

Xiaofeng Liu, Mingliang Li, Zhi Geng, Shuhong Zhu, Wenjie Li, Bin Liang

Abstract read
In one paragraph

Article in PloS one, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

6 authors.

Xiaofeng LiuThe First Construction Co., Ltd. of China Railway Construction 15th Group, Xi'an, Shaanxi, China.
Mingliang LiSchool of Civil Engineering and Architecture, Henan University of Science and Technology, Luoyang, Henan, China.ORCID 0009-0003-8518-0345
Zhi GengThe First Construction Co., Ltd. of China Railway Construction 15th Group, Xi'an, Shaanxi, China.
Shuhong ZhuThe First Construction Co., Ltd. of China Railway Construction 15th Group, Xi'an, Shaanxi, China.
Wenjie LiSchool of Civil Engineering and Architecture, Henan University of Science and Technology, Luoyang, Henan, China.ORCID 0000-0002-4066-7104
Bin LiangSchool of Civil Engineering and Architecture, Henan University of Science and Technology, Luoyang, Henan, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

This paper aims to address the problems of aerial orientation control and safety in sudden extreme working conditions during the integral intelligent lifting of large-span heavy steel box girder. Based on the project of Xiaotun Bridge of Fuyi Expressway, a new integral lifting system and control method were proposed. To prevent extreme conditions during the lifting process, the mechanical properties of steel box girders in both synchronous and asynchronous integral lifting states were investigated using the finite element method. Moreover, the mechanical properties of the steel box girders during the lifting process were analyzed through on-site monitoring. The results show that an alignment device has been added to the existing synchronous hydraulic lifting system, which achieves precise control of the aerial orientation and stress of each component of the steel box girder through informal lifting, micromotion lifting and other methods. In the synchronous lifting condition, the failure of the lifting point will cause the redistribution of internal forces in the lifting sling, thereby endangering the lifting lugs, but the stress and deformation of the steel box girder change relatively little. In the asynchronized lifting condition, the use of double lifting points may potentially result in overturning and torsion of the girder. However, under the asynchronous lifting within the displacement error limits, the overall mechanical performance of the steel box girder meets the codes. The on-site monitoring results correlate closely with the simulation results for the normal lifting conditions of the steel box girder. The maximum stress and vertical displacement of the steel box girder are approximately 74 MPa and 70 mm, respectively, indicating that the overall girder structure is safe and reliable throughout the entire lifting process.

Indexed as

LiftingSteelEquipment DesignFinite Element AnalysisHumansStress, MechanicalSteel

Identifiers

PMID40569917
PMCPMC12200647

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.