Evidence map›Paper›PMID 40473798›Full record

ArticleScientific reports2025

Settlement early warning method for high speed railway subgrades based on TD Transformer.

Wen Kebing, Liang Qinghuai

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Wen Kebing *School of Civil Engineering, Beijing Jiaotong University, Beijing, 100044, China. 41241547@qq.com.
Liang Qinghuai *School of Civil Engineering, Beijing Jiaotong University, Beijing, 100044, China.

Funding

This work was supported in part by the Key Research and Development Program of Shaanxi Province Grant No. 2023-YBSF-487This work was supported in part by the National Natural Science Foundation of China Grant No. 42072319
6 · The paper itself

Abstract

During high speed railway construction, shield-tunnel undercrossing frequently induces subgrade settlement, which threatens project safety and progress. Existing settlement monitoring methods struggle to provide timely early warnings due to unclear data features and inadequate long-term dependency modeling.To address this, we propose a settlement early warning method for high-speed railway subgrades based on TD Transformer. Firstly, we utilize temporal-spatial enhanced attention (TSEA) for feature extraction from high-speed railway settlement data, effectively resolving the problem of vague features post-extraction. Secondly, dynamic global temporal attention (DGTA) is employed to dynamically capture and represent the long-term dependencies of settlement data. Experimental results demonstrate that TD Transformer achieves Accuracy, Precision, Recall, and F1-Score of 93.39%, 93.10%, 93.40%, and 93.24%, respectively, outperforming other advanced settlement early warning methods for high-speed railway subgrade with relative improvements of 1.24%, 1.3%, 1.3%, and 1.27%.This method effectively forecasts subgrade settlement and exhibits significant superiority in the task of multi-factor settlement early warning for high-speed railway subgrades.

Indexed as

Ground surface settlementSettlement warningTransformer

Identifiers

PMID40473798
PMCPMC12141426

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.