Study on forecasting method of power engineering cost based on BIM and DynGCN.

Huijing Zhai, Jiangtao Ma

Abstract read
In one paragraph

Article in PloS one, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Huijing ZhaiShandong Electric Power Engineering Consulting Institute Corp., Ltd., Jinan, China.
Jiangtao MaShandong Electric Power Engineering Consulting Institute Corp., Ltd., Jinan, China.ORCID 0009-0005-6736-3249

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

In view of the shortcomings of power engineering cost in precision and dynamic in big data environments, this paper proposes building information modelling (BIM) and spatiotemporal modelling-based dynamic graph convolutional neural networks (DynGCN). This study uses the characteristics of BIM technology to carry out the cost management of the whole life cycle of power engineering, and realizes the dynamic control of the cost. In addition, the DynGCN method is used to predict the cost of each engineering link, so as to optimize the construction scheme of the whole project. The results show that the whole life cycle data management supported by BIM technology improves the real-time monitoring and adjustment ability of the cost; the DynGCN method can greatly improve the accuracy of the cost prediction, and the prediction accuracy is 96%, which is closest to the real value of the cost.

Indexed as

Electric Power SuppliesNeural Networks, ComputerAlgorithmsCosts and Cost AnalysisForecasting

Identifiers

PMID40341263
PMCPMC12061395

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.