Evidence map›Paper›PMID 40333827›Full record

ArticlePloS one2025

Deconstructing construction wastes: Exploring waste generation causes and their impact on project performances.

Usman Aftab, Mughees Aslam, Aman Ulhaq, Farrokh Jaleel, Sohail Malik, Hafiz Zahoor

Abstract read
In one paragraph

Article in PloS one, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

6 authors.

Usman AftabPhD Schoar, International Islamic University Islamabad (IIUI), H-10 Islamabad Campus, Department of Mechanical Engineering/ Engineering Management, Pakistan.
Mughees AslamAssociate Professor, National University of Science and Technology (NUST), Risalpur Campus, Head of Department of Construction Engineering and Management, Civil Engineering Wing, MCE, Pakistan.ORCID https://orcid.org/0000-0003-0126-2996
Aman UlhaqNational University of Science and Technology (NUST), Risalpur Campus, Civil Engineering Wing, MCE, Pakistan.ORCID https://orcid.org/0009-0004-0882-2954
Farrokh JaleelAssistant Professor, International Islamic University Islamabad (IIUI), H-10 Islamabad Campus, Department of Mechanical Engineering/ Engineering Management, Pakistan.
Sohail MalikAssistant Professor, National University of Science and Technology (NUST), Risalpur Campus, Civil Engineering Wing, MCE, Pakistan.ORCID https://orcid.org/0009-0009-8804-5185
Hafiz ZahoorAssociate Professor, National University of Science and Technology (NUST), Risalpur Campus, Civil Engineering Wing, MCE, Pakistan.ORCID https://orcid.org/0000-0003-0560-6784

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The construction industry has long been struggling with excessive costs, delays, and compromised quality due to wasteful practices, particularly in developing nations. While international efforts have focused on identifying waste-related factors, there's a research gap in pinpointing micro-level causes and analyzing their specific impacts on cost, quality, and time. This study delves into the prevalent and crucial causes of construction waste in Pakistan, evaluating their collective influence on project cost, schedule, quality, and material management. A mix of literature study findings, on-site inspections, and a survey from industry experts was used to determine the causes of non-value-adding/waste generation in construction. Using two rounds of questionnaire survey, 65 valid responses (48% of response rate) were obtained. Following the initial round, the most significant causes and their consequences on waste-related features were identified using the Relative Importance Index (RII) and mean value indexing. To confirm the influence of these waste-generating causes on Pakistani construction projects, assessments from 21 industrial experts were conducted in the second round. The data alignment between the two phases confirmed the impact of the indicated causes on waste. The study determined that inadequate worker training and awareness, planning long duration leading to material escalation, and poor workmanship are the main causes of construction waste in Pakistan. Insights from 21 construction industry experts were also acquired, offering helpful strategies to cut waste in these projects. The outcome of this study clarifies the main reasons for the negative effects of construction waste on the sector and offers recommendations for future steps to reduce their frequency.

Indexed as

Construction IndustryConstruction MaterialsIndustrial WasteWaste ManagementHumansPakistanSurveys and QuestionnairesIndustrial Waste

Identifiers

PMID40333827
PMCPMC12057941

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.