Evidence map›Paper›PMID 40281110›Full record

ArticleScientific reports2025

Synchronizing controlled logistics terminals between simulated and visualized production lines using an ASTAK method.

Zixiao Wang, Yue Dong, Shengguo Wang, Xinxiang Zhang

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Zixiao WangSchool of Information and Communication Engineering, Communication University of China, Beijing, 100024, China. wangzixiao@cuc.edu.cn.
Yue DongSchool of Information and Communication Engineering, Communication University of China, Beijing, 100024, China.
Shengguo WangChina Ordnance Industry Survey and Geotechnical Institute Co., Ltd, Beijing, 100053, China.
Xinxiang ZhangDepartment of Electrical and Computer Engineering, Southern Methodist University, Dallas, TX, 75205, USA.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

In a fully automated factory, the Visualized Production Line serves as a crucial tool for assisting personnel to monitor and manage the manufacturing process. The synchronization between the visualized line and the actual production line significantly impacts the efficiency of production supervision. This article proposes a method for controlling the logistics terminals, which encompasses three steps: animation simplification, timing alignment, and keyframe synchronization (hereinafter referred to as ASTAK). This method aims to achieve precise synchronization between the Simulated Production Line and the Visualized Production Line when the process data of the simulated line is not directly accessed. Then, the experiments demonstrate that the proposed method reduces the time difference between the simulated and visualized production lines to an average of 0.08 s with a synchronization rate of 99.97%, which further verifies the effectiveness and superiority of the proposed method over some other state-of-the-art methods.

Indexed as

Animation simplificationControllable logistics terminalKeyframeSynchronizationTiming alignment

Identifiers

PMID40281110
PMCPMC12032037

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.