Innovative BWM-TOPSIS-based approach to determine the optimum delivery method for offshore projects.

Lamisse Raed, Ibrahim Mahdi, Hassan Mohamed Hassan Ibrahim, Ehab Rashad Tolba, Ahmed M Ebid

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors.

Lamisse RaedStructural Engineering Department, Faculty of Engineering, Port Said University, Port Fuad, Egypt.
Ibrahim MahdiStructural Engineering and Construction Management Department, Faculty of Engineering and Technology, Future University in Egypt, New Cairo, Egypt.
Hassan Mohamed Hassan IbrahimStructural Engineering Department, Faculty of Engineering, Port Said University, Port Fuad, Egypt.
Ehab Rashad TolbaStructural Engineering Department, Faculty of Engineering, Port Said University, Port Fuad, Egypt.
Ahmed M EbidStructural Engineering and Construction Management Department, Faculty of Engineering and Technology, Future University in Egypt, New Cairo, Egypt. ahmed.abdelkhaleq@fue.edu.eg.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Offshore projects hold significant importance in the construction industry by fostering innovation, enabling large-scale infrastructure development, and supporting the expansion of renewable energy sources, enhancing global energy security and economic stability. Effective risk management is crucial in offshore projects to ensure operational safety, sustainability, and financial viability by identifying, assessing, and mitigating potential hazards. Selecting an appropriate project delivery method (PDM) is pivotal for efficient risk management, as it facilitates the proper allocation and mitigation of risks throughout the construction process. This study aims to investigate the impact of PDM on the risk assessment of the lifecycle of offshore platform projects and to identify and evaluate risks associated with offshore projects to improve understanding and optimize performance outcomes. In order To achieve the study's objective, the Best Worst Method (BWM) and the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) are utilized for a lifecycle-focused risk assessment to identify the optimum PDM for offshore projects. A BWM-TOPSIS system is developed specifically for offshore projects, starting with organizing risks identified from the literature into a Risk Breakdown Structure (RBS) and subsequent evaluation using the Delphi technique for comprehensive and reliable risk analysis. The findings indicate that Integrated Project Delivery (IPD) and Construction Manager at Risk (CMAR) are the most effective methods due to their higher levels of integration, collaboration, and proactive risk management.

Indexed as

BWMOffshore projectProject delivery method (PDM)Risk assessmentTOPSIS

Identifiers

PMID40246866
PMCPMC12006430

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.