An investigation study on residential buildings for cost overrun.

M K Soundarya, A Logeshkumaran, P R Kalyana Chakravarthy, P V Elumalai, S Baskar, J Anil Reddy, S Prabhakar, Liu Yu

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

8 authors.

M K SoundaryaDepartment of Civil Engineering, Vels Institute of Science, Technology and Advanced Studies, Chennai, India. mk.soundaryaa@gmail.com.
A LogeshkumaranDepartment of Civil Engineering, M. Kumarasamy College of Engineering (Autonomous), Thalavapalayam, Karur, 639113, India.
P R Kalyana ChakravarthyDepartment of Civil Engineering, Vels Institute of Science, Technology& Advanced Studies, Chennai, Tamil Nadu, 600117, India.
P V ElumalaiDepartment of Mechanical Engineering, Aditya University, Surampalem, India. elumalaimech89@gmail.com.
S BaskarDepartment of Automobile Engineering, Vels Institute of Science, Technology & Advanced Studies, Tamil Nadu, Chennai, 600 117, India.
J Anil ReddyMLR Institute of Technology, Hyderabad, India.
S PrabhakarSchool of Mechanical Engineering, Wollo University, Kombolcha, Ethiopia. prabhakar@kiot.edu.et.
Liu YuFaculty of Education, Shinawatra University, Pathum Thani, Thailand.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Construction projects are now widely recognized as being among the most important factors contributing to the overall economic development of a nation. When delays occur in these construction projects, however, both the overall progress of the projects and their profitability are affected. In this investigation, a literature review and a questionnaire survey were used to find the most important factors that cause delays in the Indian construction industry. The survey participants included clients, contractors, and structural designers. The research disclosed a total of twelve different reasons for the cost overrun. After that, the causes of these delays were ranked using three different methods: a frequency index, a severity index, and an importance index that took into account the degree of severity and the frequency with which they occurred. The responses are utilized in the procedure, which is carried out through Questionnaire. Reliability of questionnaires is carried out with the help of the Cronbach`s Alpha value, which is found to be greater than 0.70, which measures the internal consistency of values. The case study is carried out in Chennai, a metropolitan city, with the purpose of doing more research into the primary factors contributing to cost overruns. It is envisaged that the findings of this study would help in the identification of factors and causes in the building projects of India and allow the stakeholders in these projects to take efforts to prevent the incidence of these delays.

Indexed as

Construction IndustryHousingHumansIndiaSurveys and QuestionnairesCost overrunFrequency IndexImportance IndexRankingReliabilitySeverity IndexSustainable buildings

Identifiers

PMID40221494
PMCPMC11993604

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.