The two-stage location model for multi-construction period of material warehouses.
Article in PloS one, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
2 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
This article proposes a two-stage location model to construct a unified construction plan for multi-construction period material warehouses in the distribution network. Initially, we propose a honeycomb grid partitioning method aimed at managing the time-scale of electric power material demand through effective grid administration. Subsequently, we develop an optimization model for the first stage, which identifies the threshold for the upper limit of material transportation time and establishes the construction objectives for material warehousing during each construction period. To address the challenge posed by the inconsistent locations of material warehouses across different construction periods, we formulate an optimization model for the second stage. Finally, based on the spatial distribution of power demand in Taizhou City's distribution network, we devise a comprehensive construction plan for a material warehouse system that spans four construction periods. By adding nine material warehouse locations, we achieve a reduction of 57.14% in the maximum transportation time for electric power materials. The method proposed in this article provides a general solution for the long-term planning of persistent structures by converting long-term planning into construction goals across multiple stages.