A safety risk assessment method for TBM tunnel construction based on attribute interval identification theory.
Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
2 citing papers in PubMed.
- A jamming risk warning model for TBM tunnelling based on Bayesian statistical methods.Scientific reports · 2025Article
- Correlation analysis and comprehensive evaluation of dam safety monitoring at Silin hydropower station.Scientific reports · 2025Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
5 authors.
Funding
Abstract
Based on the identification and analysis of safety risks in TBM tunnel construction, we construct a comprehensive safety risk dynamic evaluation index system tailored to this context. To account for the dynamic nature of safety risks during TBM tunnel construction, variable weight theory is incorporated, allowing for a more accurate reflection of the time-varying importance of risk indicators. Building on the theoretical framework of attribute interval recognition theory, we establish a TBM tunnel construction safety risk evaluation model grounded in attribute interval theory. This model effectively addresses the various uncertainties inherent in the risk evaluation process for TBM tunnel construction. It determines the evaluation level and attribute intervals for each individual indicator, and subsequently calculates the interval values for both the individual indicators and the composite attribute. Finally, a case study demonstrates the model's effectiveness and practical applicability.