Evidence map›Paper›PMID 40025223›Full record

ArticleScientific reports2025

Data transformation and recombination based on large model: design of multi-group personalized Bridge models.

Ming Chen

Abstract read
In one paragraph

Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

1 author.

Ming ChenSchool of Architecture Engineering, Shanghai ZhongQiao Vocational and Technical University, Shanghai, 201514, China. 15425426@qq.com.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Bridge life cycle management is a collaborative work process involving multiple groups, and finite element analysis is a popular method used in bridge management. The frequent establishment of finite element models by diverse groups directly reduces the efficiency and quality of bridge management. To address this issue, a large model of bridge model transformation was developed by integrating domain knowledge based on existing general large models, and data transformation and data recombination were proposed. Simulation investigation demonstrates that the proposed bridge modeling approach may generate finite element models that fulfill the various needs of participating organizations based on their specific criteria. The domain knowledge base supports the data transformation algorithm, which calls the Pangu Large Model's scientific computing model to enable autonomous data translation, minimizing the amount of time spent manually participating in the modeling process. The seismic study of the bridge reveals that the finite element model generated using data recombination differs by 5.93% from the analytical results of the manually established finite element model. Overall, data transformation and recombination modeling methods have greatly increased bridge modeling efficiency, reducing the need for duplicate modeling and improving bridge management efficiency.

Indexed as

AlgorithmsBridge engineeringBridge modelingData processingData recombinationData transformationLarge modelSimulation analysis

Identifiers

PMID40025223
PMCPMC11873238

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.