Determinants of road construction project delay in the case of Woliso-Ambo road construction.
Article in Scientific reports, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
2 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Despite delays, infrastructure development is crucial for socio-economic development and economic growth. Identifying and managing these delays increases project quality, reduces conflicts and risks, and ultimately contributes to overall development. This study summarizes the variables influencing the delay of the Woliso-Ambo Road construction project via multiple regression analysis and questionnaire surveys. With an emphasis on the Woliso-Ambo Road construction project, this paper sought to identify and examine several factors contributing to road construction delays. The data were collected from important project participants, such as project managers, engineers, contractors, and government representatives, via a questionnaire survey and unstructured interviews in addition to secondary documents. The associations between various parameters and project delays were then evaluated via multiple regression analysis of the data obtained from the questionnaire survey. The investigation considered several concerns, including escalation of material price influence, delays in the subcontractor work influence, material and equipment influence, inadequate management and supervision by consultants, and peace and security situations. The study findings showed that the Woliso-Ambo Road construction project had delays, mainly due to the increase in material price and material influence and equipment influence. The beta value of the regression reflects the direct relationship between the dependent and independent variables. The Multiple Regression model performed a strong R-value of 0.893 and an adjusted R-square of 0.797, indicating that the selected factors explained 79% of the variation in road construction delays. The results emphasize the importance of efficient planning and project management techniques to ensure the timely completion of road construction projects. The time overrun 97.4%, cost overrun 85.6%, financial loss 76.7%, company reputation 70.4%, poor quality of work 69.01%, contract relocation 65.7%, and poor quality 60.3% are the outcomes of the delays in the project areas. This study provides insightful information on the causes of delays in road construction projects and suggestions for improving project performance.