ArticleNature communications2025
Finding gaps in the national electric vehicle charging station coverage of the United States.
Article in Nature communications, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 3 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
3 citing papers in PubMed.
- Mobility and Income: Policy Insights to Support Public Electric Vehicle Charging Access.Environmental science & technology · 2026Article
- Path informed adaptive trend analyzer using Hilbert Huang transform for electric vehicle driving range prediction.Scientific reports · 2026Article
- Equity and reliability of public electric vehicle charging stations in the United States.Nature communications · 2025Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
7 authors.
Funding
Abstract
The United States federal government has invested $7.5 billion into charging infrastructure, including the National Electric Vehicle Infrastructure Program, to build fast charging stations along designated highways for long-distance car travel. We develop a consecutive coverage metric to compute the percent of United States roads (traffic-weighted) that are consecutively accessible within 500 miles of each county. We answer (1) what the state of consecutive coverage is in each county and (2) what the increase in coverage is when designated highways receive fast chargers. In 2023, 10% of counties had at least 75% minimum viable coverage. We find that if all designated highways receive fast-charging stations, 94% of United States counties will reach at least 75% fast charger coverage. However, the remaining counties are rural. This demonstrates that federal funding for fast chargers will help connect most-but not all-counties to the national network of continuously accessible charging stations.
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.