Supply chain risk transmission monitoring based on graphic evaluation and review technique.

Jianlan Zhong, Fu Jia

Abstract read
In one paragraph

Article in Heliyon, 2025. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

2 authors.

Jianlan ZhongCollege of Economics and Management, Fujian Agriculture and Forestry University, Fuzhou, 350002, China.
Fu JiaSupply Chain Management, The York Management School, University of York, YO10 5DD, UK.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

In the supply chain context, risk events can accumulate, amplify, and mutate as they spread through the supply chain network structure. This can lead to significant losses for supply chains and global businesses. Therefore, monitoring supply chain risk is crucial to ensure the smooth operation of the supply chain. To address this issue, our study focuses on the DongNan automobile manufacturing supply chain and examines the monitoring of lead time risk. We use the graphic evaluation and review technique (GERT) to characterize the topology of the risk transmission network in the supply chain and construct a supply chain risk transmission model. We then use the change-point control chart to monitor risk factors, specifically delayed lead time. Our study includes a case study that demonstrates the effectiveness of the change-point control chart in signaling and accurately estimating the change point and out-of-control stage in terms of performance indices. We also investigate the impact of mis-specified risk function parameters on the chart's performance, finding that it remains relatively stable. Overall, the change-point control chart is an effective tool for monitoring supply chain risk, and its monitoring effect is relatively stable.

Indexed as

Change-pointControl chartDelivery timeGERTRisk factors

Identifiers

PMID39850431
PMCPMC11754171

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.