Evidence map›Paper›PMID 39639080›Full record

ArticleScientific reports2024

The application obstacles of BIM technology in green building project and its key role path analysis.

Ge Meng, Hao Hu, Long Chen

Abstract read
In one paragraph

Article in Scientific reports, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 3 papers.

0numbers the graph read from it
0cells of the map it votes in
3citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

3 citing papers in PubMed.

  1. Article
  2. Article
  3. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors.

Ge MengSchool of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan, 430074, China.
Hao HuSchool of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan, 430074, China. fox59822@163.com.
Long ChenChina MCC5 Group Corp. Ltd, Chengdu, 610056, China.

Funding

The 15th Graduate Education Innovation Fund of Wuhan Institute of Technology, China CX2023344
6 · The paper itself

Abstract

The purpose of this study is to identify and analyze the application barriers and internal mechanisms of BIM technology in green building projects. It is found that BIM technology can effectively integrate information and optimize management, but its application still faces economic externalities and requires government intervention to promote its development. Through the analysis of five aspects of technology, economy, management, policy and environment, we identified 16 influencing factors and focused on nine key factors, such as insufficient technology maturity and high-cost issues. Research shows that policy and management factors play a fundamental role in BIM adoption and influence economic effectiveness through complex interactions. Based on the ISM-ANP coupling model, we propose that the government should encourage technological innovation and personnel training to promote the effective application of BIM technology in green buildings. This study provides a theoretical reference for the application of BIM and green building on a global scale.

Indexed as

Action pathAnalytic network processApplication barriersBIMGreen buildingInterpretive structural model

Identifiers

PMID39639080
PMCPMC11621689

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.