Developing a construction waste management performance calculator for highway construction.

Zhizhe Zheng, Yikun Su, Xing Wang, Zhichao Zhou

Abstract read
In one paragraph

Article in Scientific reports, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Zhizhe ZhengSchool of Civil Engineering and Transportation, Northeast Forestry University, 26 He Xing Road, Harbin, 150040, China.
Yikun SuSchool of Civil Engineering and Transportation, Northeast Forestry University, 26 He Xing Road, Harbin, 150040, China. yikunsu_nefu@163.com.
Xing WangSchool of Civil Engineering and Transportation, Northeast Forestry University, 26 He Xing Road, Harbin, 150040, China.
Zhichao ZhouSchool of Civil Engineering and Transportation, Northeast Forestry University, 26 He Xing Road, Harbin, 150040, China.

Funding

Key Science and Technology Projects in the Transport Sector 2019-ZD5-028National Key Research and Development Program of China 2021YFF0602002Philosophy and Social Science Foundation of Heilongjiang Province 21GLB063
6 · The paper itself

Abstract

The generation of a substantial amount of construction waste (CW) poses significant challenges to the green transition of highway construction projects. However, the construction industry lacks integration of construction waste management (CWM) practices into the construction process. This paper aims to develop a calculation for assessing the performance of CWM to monitor its effectiveness in highway construction. Initially, this study utilizes the Site waste management plan (SWMP) as a foundation and develops a Construction Waste Management Performed Assessment Method (CWMPAM). The extension of CWM is incorporated into earned value management (EVM) to manage costs, schedules, and the performance of CWM within a unified framework. The functionality and sensitivity of CWMPAM and CWM-embedded EVM are validated through pilot testing and scenario analysis. The research results are computerized into a calculator to facilitate the practical application of CWM, and its validity is tested using random cases. CWMPAM and CWM-embedded EVM prove satisfactory in assessing and monitoring the execution and performance of CWM. The developed calculator simplifies the practical application of the outcomes. Essentially, the developed calculator represents a groundbreaking integration of CWM and construction management, enabling project managers to monitor and compare the CWM performance across different segments of highway construction. Not only does this contribute to the green transformation of highway projects, it also promotes high quality and sustainable development in the construction industry.

Indexed as

Construction waste managementEarned value managementHighway constructionPerformance calculatorSite waste management plan (SWMP)

Identifiers

PMID39533048
PMCPMC11557856

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.