ArticleHeliyon2024

An ISM-MICMAC-based study for identification and classification of preventable safety risk mitigation factors in mass housing projects following a BIM approach.

Amir Mohammad Maleki Toulabi, Towhid Pourrostam, Babak Aminnejad

Abstract read
In one paragraph

Article in Heliyon, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors.

Amir Mohammad Maleki ToulabiDepartment of Civil Engineering, Qeshm Branch, Islamic Azad University, Qeshm, Iran.
Towhid PourrostamDepartment of Civil Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran.
Babak AminnejadDepartment of Civil Engineering, Roudehen Branch, Islamic Azad University, Roudehen, Iran.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Construction operation is among the most high-risk sectors in terms of work-related accident, making it highly challenging to surveil the safety of such projects. In construction projects, failure to observe safety represents a leading cause of fatal accidents, not to mention the losses incurred by such accidents to national assets of the country. Accordingly, recent decades have witnessed the emergence of modern techniques for improving the occupational safety of construction projects. The main purpose of the present research is to identify and classify different preventable risk mitigation factors in mass housing projects following a building information modeling (BIM) approach. The research methodology included interviews with relevant experts and elites followed by analysis of the data on the 12 identified-as-significant variables for mitigating the preventable risk factors in mass house construction projects by means of the inferential - structural modeling (ISM) in MICMAC software. In order to explore the relationships among and succession of different criteria and further classify them at different levels, ISM was implemented, with the MICMAC software used to analyze the direct and indirect influences, develop influence/dependence maps, and judge about the role of each criterion. Findings of the present research showed that the mutual relations (H3), the reward system (H6), the reporting system (H7), and the supervisors' supervision (H8) are autonomous variables and hence impose the smallest contributions to the system. Accordingly, they can be eliminated from the model though their effects may not be completely ignored. On the other hand, the employees' empowering (H4), the safety management system (H5), the teamwork (H9), the self-efficiency (H10), and the knowledge and awareness (H11) were identified as the linkage variables that fill in the gap between the safety and occupational accident reduction in the mass house construction projects. Further, the continuous improvement (H2) and the safe behavior (H12) were identified as dependent variables, implying that they exhibit the weakest influence coupled with highest dependence on any change in the conditions of the system. Last but not the least, the management commitment (H1) was identified as the only dependent variable which deserves lots of attention. This information can be helpful to safety decision-makers, end users, research organizations, and academic institutes who work to reduce the preventable risk factors in mass house construction projects.

Indexed as

BIMISM-MICMACMass housing projectsSafety hazardsUrban constructions

Identifiers

PMID39386802
PMCPMC11462378

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.