Evidence map›Paper›PMID 39157346›Full record

ArticleHeliyon2024

A qualitative exploration and a Fuzzy Delphi validation of high-risk scaffolding tasks and fatigue-related safety behavioural deviation among scaffolders.

Hanizah Mohd Yusoff, Pei Pei Heng, Mohamad Ridza Hj Illias, Saravanan Karrupayah, Mohd Anis Fadhli, Rozita Hod

Abstract read
In one paragraph

Article in Heliyon, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 4 papers.

0numbers the graph read from it
0cells of the map it votes in
4citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

4 citing papers in PubMed.

  1. Article
  2. Article
  3. Article
  4. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

6 authors.

Hanizah Mohd YusoffDepartment of Public Health Medicine, Faculty of Medicine, Universiti Kebangsaan Malaysia, Bandar Tun Razak, 56000, Wilayah Persekutuan Kuala Lumpur, Malaysia.
Pei Pei HengDepartment of Public Health Medicine, Faculty of Medicine, Universiti Kebangsaan Malaysia, Bandar Tun Razak, 56000, Wilayah Persekutuan Kuala Lumpur, Malaysia.
Mohamad Ridza Hj IlliasMKRS Training Institute, Malaysian Scaffold Academy, Bangi Hub Suntrack Industrial Park, 43650, Bandar Baru Bangi, Selangor, Malaysia.
Saravanan KarrupayahMKRS Training Institute, Malaysian Scaffold Academy, Bangi Hub Suntrack Industrial Park, 43650, Bandar Baru Bangi, Selangor, Malaysia.
Mohd Anis FadhliMKRS Training Institute, Malaysian Scaffold Academy, Bangi Hub Suntrack Industrial Park, 43650, Bandar Baru Bangi, Selangor, Malaysia.
Rozita HodDepartment of Public Health Medicine, Faculty of Medicine, Universiti Kebangsaan Malaysia, Bandar Tun Razak, 56000, Wilayah Persekutuan Kuala Lumpur, Malaysia.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Background: Most construction mishaps were caused by scaffolding incidents despite implementing various safety measures, and the association with human factors like fatigue has been widely reported. This study aims to identify all high-risk task sequences involved during the erection of the most commonly used scaffold; the deviation from the standard protocol led to a substandard fatigue state, followed by content validation using the Fuzzy Delphi Method. Methods: Qualitative exploration was conducted via focal group discussions (FGDs) involving 30 certified experts. The findings generated from FGDs were further validated by utilising the Fuzzy Delphi Method (FDM) by consulting 19 experts with extensive practical experience and leadership roles in scaffolding safety. Results: The FGDs identified a total of 7 constructs and 50 items for task sequences involved in the tubular scaffold erection, namely construct Instruction (3 items), Preparation (3 items), Foundation (10 items), First Lift (8 items), Working Platform (7 items), Guardrails (5 items) and Second Lift (14 items). In the FDM validation process, the experts' consensus for each construct was fulfilled with a threshold value (d) ≤ 0.2; thus, all constructs were accepted. Experts' consensus for all items achieved an expert agreement of 75 % and above. Items ranking was conducted using average fuzzy numbers. The highest average fuzzy number documented was 0.8, while the lowest was 0.588. None of the items with the lowest ranking was discarded as all items perfectly fulfilled the second prerequisite and obtained excellent experts' agreement. Conclusions: The tool generated will help guide the development of a protocol for scaffolding safety management.

Indexed as

Fuzzy delphi validationHigh-risk scaffolding tasksScaffoldersUnsafe behaviour

Identifiers

PMID39157346
PMCPMC11327525

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.