Study on deformation of tunnel pile foundation based on discrete element method and finite difference method.

Zhenchu Zhao, Yuan Zhang, Fang Dai

Abstract read
In one paragraph

Article in PloS one, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors.

Zhenchu ZhaoSchool of Civil Engineering, Central South University, Changsha, China.
Yuan ZhangPower China, Zhongnan Engineering Co., Ltd., Changsha, China.
Fang DaiSchool of Civil Engineering, Central South University, Changsha, China.ORCID 0009-0005-9481-5423

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The deformation of pile caused by tunnel excavation will weaken the bearing capacity of the foundation. In order to investigate the deformation response of pile induced by the construction of three-hole small spacing tunnel, the DEM-FDM (discrete element method and finite difference method) coupling numerical simulation method were used to simulate the deformation process of pile during tunnel excavation. This paper probed into the deformation response of pile by three factors: the length of pile, the pile-tunnel spacing, and the three-hole tunnel construction. The results showed that, as the pile-tunnel spacing decreases, the incremental horizontal displacement of the pile top became more significant when the three-hole tunnel was excavated. The excavation resulting in four zones of horizontal displacement concentration. The prominent locations were mainly concentrated on both sides of the tunnel and the ground directly above the tunnel. The research findings of this study can provide insights and references for the design and construction of shield tunneling under passing piles.

Indexed as

Finite Element AnalysisComputer SimulationModels, Theoretical

Identifiers

PMID39024401
PMCPMC11257389

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.