Evidence map›Paper›PMID 38905191›Full record

ArticlePloS one2024

Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints.

Rafael Muñoz-Sánchez, Iris Martínez-Salazar, José Luis González-Velarde, Yasmín Á Ríos Solís

Abstract read
In one paragraph

Article in PloS one, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

4 authors.

Rafael Muñoz-SánchezFacultad de Ingeniería Mecánica y Eléctrica, Universidad Autónoma de Nuevo León, San Nicolás de los Garza, Nuevo León, México.
Iris Martínez-SalazarFacultad de Ingeniería Mecánica y Eléctrica, Universidad Autónoma de Nuevo León, San Nicolás de los Garza, Nuevo León, México.ORCID 0000-0002-0037-5764
José Luis González-VelardeSchool of Engineering and Science, Tecnológico de Monterrey, Monterrey, Nuevo León, México.
Yasmín Á Ríos SolísSchool of Engineering and Science, Tecnológico de Monterrey, Monterrey, Nuevo León, México.ORCID 0000-0003-3785-4440

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Two hybrid flow shop scheduling lines must be coordinated to assemble batches of terminated products at their last stage. Each product is thus composed of two jobs, each produced in one of the lines. The set of jobs is to be processed in a series of stages to minimize the makespan of the scheduling, but jobs forming a product must arrive at the assembly line simultaneously. We propose a mixed integer linear programming model. Then, based on the model, we propose a pull-matheuristic algorithm. Finally, we present two metaheuristics, a greedy randomized adaptive search procedure and a biased random key genetic algorithm, and compare all the methodologies with real-based instances of a production scheduling problem in the automobile manufacturing industry. The greedy algorithm yields high-quality solutions, while the genetic one offers the best computational times.

Indexed as

AlgorithmsAutomobilesModels, Theoretical

Identifiers

PMID38905191
PMCPMC11192364

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.