Evidence map›Paper›PMID 38678907›Full record

ArticleJournal of environmental management2024

Bioenergy-producing two-stage septic tank and floating wetland for onsite wastewater treatment: Circuit connection and external aeration.

Tanveer Saeed, Abdullah Al-Muyeed, Takrim Zaman, Mehedi Hasan, Tanvir Ahmed

Abstract read
In one paragraph

Article in Journal of environmental management, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors.

Tanveer SaeedDepartment of Civil Engineering, University of Asia Pacific, Dhaka, 1205, Bangladesh; Institute of Energy, Environment, Research and Development (IEERD), University of Asia Pacific, Dhaka, 1205, Bangladesh. Electronic address: dr.tanveer@uap-bd.edu.
Abdullah Al-MuyeedCWIS-FSM Support Cell, Department of Public Health Engineering, Government of the People's Republic of Bangladesh, Dhaka, 1000, Bangladesh. Electronic address: aamuyeed@cwisfsmsupportcell.org.
Takrim ZamanDepartment of Civil Engineering, University of Asia Pacific, Dhaka, 1205, Bangladesh. Electronic address: 17205053@uap-bd.edu.
Mehedi HasanITN-BUET Centre for Water Supply and Waste Management, Bangladesh University of Engineering and Technology, Dhaka, 1000, Bangladesh. Electronic address: mehedi@itn-buet.org.
Tanvir AhmedITN-BUET Centre for Water Supply and Waste Management, Bangladesh University of Engineering and Technology, Dhaka, 1000, Bangladesh; Department of Civil Engineering, Bangladesh University of Engineering and Technology, Dhaka, 1000, Bangladesh. Electronic address: tanvir@itn-buet.org.

Funding

Bill & Melinda Gates Foundation INV-028835
6 · The paper itself

Abstract

This study designed a two-stage, electrode-integrated septic tank-floating wetland system and assessed their pollutant removal performances under variable operational conditions. The two-stage system achieved mean organic, nitrogen, phosphorus, and coliform removal percentages of 99, 78, 99, and 97%, respectively, throughout the experimental run. The mean metals (chromium, cadmium, nickel, copper, zinc, lead, iron, and manganese) removal percentages ranged between 81 and 98%. Accumulated sludge, filler media, and the hanging root mass contributed to pollutant removals by supporting physicochemical and biological pathways. The mean effluent organic concentration and coliform number across the two-stage system were 20 mg/L and 1682 CFU/100 mL, respectively, during the closed-circuit protocol, which was beneath the open-circuit-based performance profiles, i.e., 32 mg/L and 2860 CFU/100 mL, respectively. Effluent organic, nitrogen, phosphorus, metals, and coliform number ranges across the two-stage system were 9-17 mg/L, 13-24 mg/L, 1-1.5 mg/L, 0.001-0.2 mg/L, and 1410-2270 CFU/100 mL, respectively during intermittent and continuous aeration periods. The air supply rate differences influenced pollutant removal depending on the associated removal mechanisms. The non-aeration phase produced higher effluent pollutant concentrations than the aeration periods-based profiles. The overall mean power density production of the septic tank ranged between 107 and 596 mW/m

Indexed as

NitrogenPhosphorusWaste Disposal, FluidWastewaterWetlandsSewageNitrogenPhosphorusSewageWastewaterDecentralized wastewater treatmentElectrical conductivityEnergyExternal air supplyRemoval pathways

Identifiers

PMID38678907
PMCPMC11129191

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.