A method for managing scientific research project resource conflicts and predicting risks using BP neural networks.
Article in Scientific reports, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 2 papers.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
2 citing papers in PubMed.
- An efficient Draco lizard optimized stacked Bi-LSTM framework for risk mitigation and resource allocation in project management systems.Scientific reports · 2026Article
- AI-optimized BPNN model for port safety risk prediction and management.Scientific reports · 2026Article
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
2 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
This study begins by considering the resource-sharing characteristics of scientific research projects to address the issues of resource misalignment and conflict in scientific research project management. It comprehensively evaluates the tangible and intangible resources required during project execution and establishes a resource conflict risk index system. Subsequently, a resource conflict risk management model for scientific research projects is developed using Back Propagation (BP) neural networks. This model incorporates the Dropout regularization technique to enhance the generalization capacity of the BP neural network. Leveraging the BP neural network's non-linear fitting capabilities, it captures the intricate relationship between project resource demand and supply. Additionally, the model employs self-learning to continuously adapt to new scenarios based on historical data, enabling more precise resource conflict risk assessments. Finally, the model's performance is analyzed. The results reveal that risks in scientific research project management primarily fall into six categories: material, equipment, personnel, financial, time, and organizational factors. This study's model algorithm exhibits the highest accuracy in predicting time-related risks, achieving 97.21%, surpassing convolutional neural network algorithms. Furthermore, the Root Mean Squared Error of the model algorithm remains stable at approximately 0.03, regardless of the number of hidden layer neurons, demonstrating excellent fitting capabilities. The developed BP neural network risk prediction framework in this study, while not directly influencing resource utilization efficiency or mitigating resource conflicts, aims to offer robust data support for research project managers when making decisions on resource allocation. The framework provides valuable insights through sensitivity analysis of organizational risks and other factors, with their relative importance reaching up to 20%. Further research should focus on defining specific strategies for various risk factors to effectively enhance resource utilization efficiency and manage resource conflicts.