An optimization model for monthly time-step drilling schedule under planned field production.

Jingyun Ouyang, Shaoyang Geng, Shuo Zhai

Abstract read
In one paragraph

Article in Heliyon, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

3 authors.

Jingyun OuyangChengdu North Petroleum Exploration and Development Technology Co., Ltd., Chengdu, Sichuan, China.
Shaoyang GengCollege of Energy, Chengdu University of Technology, Chengdu, Sichuan, China.
Shuo ZhaiCollege of Energy, Chengdu University of Technology, Chengdu, Sichuan, China.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

The field production profile over the yearly horizon is planned for a balance between economy, security, and sustainability of energy. An optimal drilling schedule is required to achieve the planned production profile with minimized drilling frequency and summation. In this study, we treat each possible production process of each well as a dependent time series and the basic unit. Then we ensemble all of them into a tensor. Based on formulated tensor calculation and Lasso regularization, a linear mathematical optimization model for well drilling schedule was developed. The model is aimed at minimizing production profile error while optimizing drilling frequency and summation. Although the model proposed in this work requires more memory consumption to be solved using a computer, it is assured as a linear model and could be numerically globally solved in a stable and efficient way using gradient descent, avoiding complex nonlinear programming problems. Main input data and parameters involved in the model are analyzed in detail to understand the effects of different production parameters on the drilling schedule and production profile. The proposed model in this work can evaluate the manual drilling schedule and automatically generate an optimized drilling schedule for the gas field, significantly reducing development plan formulation time.

Indexed as

Development plan optimizationDrilling schedule optimizationGradient descent methodProduction optimization model

Identifiers

PMID38628737
PMCPMC11019172

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.