Evidence map›Paper›PMID 38538639›Full record

ArticleScientific reports2024

Application and configuration analysis of electric muck transfer equipment in plateau railway tunnel: a case study in southwest China.

Xiaoxu Yang, Yuming Liu, Kai Liu, Jianying Wei, Guangzhong Hu, Shifan Pei

Erratum issuedAbstract read
In one paragraph

Article in Scientific reports, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. An erratum has been issued. Not yet cited in PubMed.

0numbers the graph read from it
0cells of the map it votes in
0citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

0 citing papers in PubMed.

No citing paper in PubMed yet.

4 · The record

Corrections and comments

5 · Who and what money

Authors and funding

6 authors.

Xiaoxu YangSchool of Economics and Management, Beijing Jiaotong University, Beijing, 100044, China. 22110202@bjtu.edu.cn.
Yuming LiuSchool of Economics and Management, Beijing Jiaotong University, Beijing, 100044, China.
Kai LiuSchool of Economics and Management, Beijing Jiaotong University, Beijing, 100044, China.
Jianying WeiSchool of Economics and Management, Beijing Jiaotong University, Beijing, 100044, China.
Guangzhong HuSchool of Economics and Management, Beijing Jiaotong University, Beijing, 100044, China.
Shifan PeiSchool of Economics and Management, Beijing Jiaotong University, Beijing, 100044, China.

Funding

Fundamental Research Funds for the Railway Research Institute Group Limited Foundation of China No. 2021YJ111
6 · The paper itself

Abstract

The burgeoning development of railway construction in plateau regions of southwest China necessitates innovative and environmentally sustainable approaches, particularly in the realm of tunnel construction, where the transfer of muck poses significant operational and environmental challenges. This research, pivoting around the application and configuration of electric muck transfer equipment in plateau railway tunnels, seeks to dissect the potentialities and impediments of transitioning from conventional diesel-powered machinery to electric alternatives, with a spotlight on mitigating environmental impacts and enhancing operational efficiency. Through an analytical lens, the study employs a case study methodology, leveraging data and insights from existing electric equipment models and their applications, provided by major manufacturers in China, to weave a comprehensive narrative around the practicalities, specifications, and challenges embedded in the adoption of electric machinery in plateau environments. The findings unveil a nuanced landscape, where the environmental and operational advantages of electric equipment are juxtaposed against a backdrop of technological, financial, and infrastructural hurdles, thereby crafting a complex tapestry of opportunities and challenges. The research further extrapolates policy recommendations and practical guidelines, advocating for a harmonized amalgamation of governmental policies, technological advancements, and strategic planning to navigate through the identified challenges and optimize the integration of electric equipment in tunnel construction practices. Envisaging future research pathways, the study underscores the criticality of perpetuating technological innovations, policy adaptations, and interdisciplinary research to further refine and enhance the application of electric muck transfer equipment in plateau railway tunnel projects, thereby contributing to the broader narrative of sustainable construction practices in challenging terrains.

Indexed as

Application and configuration analysisDrilling and blasting methodElectric equipmentMuck transferPlateau railway tunnel

Identifiers

PMID38538639
PMCPMC10973456

What OpenQuestion holds

Textmetadata
LicenceCC BY
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.