ArticleHeliyon2024
Study on the deformation law of the construction of the cutoff wall of the reservoir.
Article in Heliyon, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Not yet cited in PubMed.
What it found
Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.
The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.
The trial behind it
Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.
Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.
Who cites it
0 citing papers in PubMed.
No citing paper in PubMed yet.
Corrections and comments
PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.
Authors and funding
4 authors.
Funding
No grant is acknowledged in the PubMed record.
Abstract
Relying on the middle line of south-to-north water diversion project ning storage reservoir has built the construction load impact assessment project, the study through the analysis of field conditions select reasonable monitoring section and monitoring scheme, the late monitoring, the results can reflect the overall deformation of the wall and stress, and use in advance in the wall, monitoring instruments, to the typical section of field deformation, pressure, strain and stress, automatic oblique monitoring results to introduce the stress strain of the whole wall. Research results: The soil pressure showed the larger on the outside and the slightly smaller on the inside; Concrete strain relative to the initial state in the direction of vertical wall and vertical strain increment is larger, The strain increment along the wall direction is small; The data of the reinforcement stress gauge are all negative, And the quantity value of the inner steel bar gauge continues to increase, The monitoring value of the outer steel bar gauge has a tendency to decrease gradually; Small displacement of the plastic concrete walls, Large displacement of reinforced concrete walls, And the value along the wall for the small law; The inclination displacement value of monitoring section 2-2 and 3-3 gradually decreases with the continuous construction, The displacement value of monitoring 1-1 section also becomes smaller in the first and middle stages of construction, But in the late construction, This shows that the horizontal displacement of the monitoring 1-1 section in the later construction period has a recovery trend; The top settlement value is larger at the 1st-3rd wall, About 6 mm-10mm, The 4-6 pin is smaller, About 4 mm-5mm, Article 7-10, the pin is directly crushed by the vehicle, Its value is approximately 6 mm-8mm.
Indexed as
Identifiers
What OpenQuestion holds
Registered trials
Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.