Evidence map›Paper›PMID 38390037›Full record

ArticleHeliyon2024

An integrated DEMATEL and system dynamic model for project cost prediction.

Abdullah M Alsugair, Khalid S Al-Gahtani, Naif M Alsanabani, Ghalib M Hommadi, Marwan I Alawshan

Abstract read
In one paragraph

Article in Heliyon, 2024. The graph could read no effect estimate from its abstract, so it casts no vote on the map. Cited by 1 paper.

0numbers the graph read from it
0cells of the map it votes in
1citing papers in PubMed
–field-weighted citation impact
1 · What the graph read from it

What it found

Each row is one number read from the abstract, on the scale the paper reported it, with its interval. Left of the dashed line favours the treatment, right favours the comparator. Under each row is the sentence it came from. New to these charts? A ten-minute tutorial.

The abstract states no effect estimate the extractor could read, or names no intervention and outcome on the map, so this paper lights no cell and moves no belief. It is still indexed, cited and linked below.

2 · The registry

The trial behind it

Trials whose registry record cites this paper, or whose number appears in the abstract. A trial that started after this paper was published is citing it as background, not reporting it.

Neither the registry nor the abstract names a trial number. If this is a trial report, that itself is worth knowing.

3 · Its place in the literature

Who cites it

1 citing paper in PubMed.

  1. Article
4 · The record

Corrections and comments

PubMed lists nothing against this paper. Absence here is not a guarantee, only a check that was made.

5 · Who and what money

Authors and funding

5 authors.

Abdullah M AlsugairDepartment of Civil Engineering, College of Engineering, King Saud University, Riyadh, P. O. Box 800, Riyadh, 11421, Saudi Arabia.
Khalid S Al-GahtaniDepartment of Civil Engineering, College of Engineering, King Saud University, Riyadh, P. O. Box 800, Riyadh, 11421, Saudi Arabia.
Naif M AlsanabaniDepartment of Civil Engineering, College of Engineering, King Saud University, Riyadh, P. O. Box 800, Riyadh, 11421, Saudi Arabia.
Ghalib M HommadiDepartment of Civil Engineering, College of Engineering, King Saud University, Riyadh, P. O. Box 800, Riyadh, 11421, Saudi Arabia.
Marwan I AlawshanDepartment of Civil Engineering, College of Engineering, King Saud University, Riyadh, P. O. Box 800, Riyadh, 11421, Saudi Arabia.

Funding

No grant is acknowledged in the PubMed record.

6 · The paper itself

Abstract

Actual cost fluctuations in construction projects are common in the construction industry, including the Kingdom of Saudi Arabia (KSA). This study's objective is to establish a simulation forecasting model for Saudi projects' cost changes that will be used to anticipate the actual cost spent at the project's end. It also indicates if there are cost overruns or savings by considering ten identified cost-risk impact factors. The study involves a systematic, integrated approach to developing system dynamics (SD) to reflect the ten cost overrun impact factors (COICs) in the KSA construction industry. Thus, the Decision-Making Trial and Evaluation Laboratory (DEMATEL) technique aids in evolving a Causal Loop Diagram (CLD) in the SD modeling stages. After performing the consistency and extreme tests, the model is verified by being applied in two case studies (an academic building and an infrastructure project) in Riyadh City, KSA. The main findings reveal that the model provided cost savings for the first and second case studies of 4.8% and 3.76%, respectively. Different experts have evaluated the developed dynamic system. According to the experts who support the developed model, the model is applicable if the contractor has a reasonable profit margin. In contrast, opponents' experts noted that the system still generates a profit margin despite change orders and project delays. The main conclusion that the experts recognize is that the approach successfully considered the relationships between the influencing factors. The findings can be utilized to create an integrated conceptual framework for construction management, which could result in a rapid and profitable project launch.

Indexed as

Actual costDEMATELEarned valueForecastOverrunProject productionS-curveSystem dynamic

Identifiers

PMID38390037
PMCPMC10881366

What OpenQuestion holds

Textmetadata
LicenceCC BY-NC-ND
Read underepoch 390

Registered trials

None linked

Read under generation 80e0d062 · epoch 390. Bibliography from PubMed, PubMed Central and OpenAlex; grants from NIH RePORTER; trial links from ClinicalTrials.gov; estimates, votes and beliefs from the OpenQuestion graph.